Air vent
Load interface
Power
output
socket
3. Operating instructions
3.1 Open-package inspection
Open-package inspection aims to confirm the completeness of associated parts. The
packing list is given below.
Name
Main unit
Power line
Operating Instructions
Table 3
If you find any damage on the packing, please specify the damage after receipt. If you
find any internal damage after unpacking, please contact your local supplier or
manufacturer.
Note:
If you find any visible damage on the product, please don't connect the
product to power supply.
Connects with air or inertia gas if necessary.
Connects the load, such as revolving evaporator.
Provides power supply to vacuum pump.
Table 2
Qty.
1
1
1
4
Need help?
Do you have a question about the SCI100VC and is the answer not in the manual?