Display Activation - ABB AquaProbe 2 Installation Manual

Insertion-type electromagnetic probe flowmeter
Table of Contents

Advertisement

Insertion-Type Electromagnetic Probe Flowmeter
AquaProbe 2
Pictorial Displays
Warning annunciators
Left Battery Warning
Sensor Fault
Empty Pipe condition
Mains Failure
Right Battery Warning
Fig. 5.1 Location of Controls

5.3 Display Activation

For normal operation, activate the light sensitive display by first covering the display area totally. On
removing the covering, the display activates and cycles through the programmed set of display
measurements.
With external power applied, the display is permanently activated.
To alter the displayed set of measurements, or instrument setup, see the Quick Reference Programming
Guide.
Note. For the use of local or remote serial communication, and configuration, see the Quick Reference
Programming Guide.
IM/AP
Issue 9
AquaMaster
3
m
88888.888.
8
gal
3
AB
f t m
/ h M G D
0 -
.8.8.8.80
CD
g a l / s m B a r p s i
5 Start Up And Operation
Upper Display
Date
Forward Flow Total
Reverse Flow Total
Net Flow Total
Lower Display
Time
Flow Velocity
Pressure
33

Advertisement

Table of Contents
loading

Table of Contents