INSTALLATION

See Section 2 for important notes concerning installation.
The OMD-2008 EV-FC Monitor should be located as close as possible to the oily
water separator to minimize response delays. According MEPC.107(49) the
layout of the installation should be arranged so that the overall response time
(including the response time of the 15 ppm Bilge Alarm, which is less than 5 s.)
between an effluent discharge from the 15 ppm Bilge Separator exceeding 15
ppm, and the operation of the Automatic Stopping Device preventing overboard
discharge, should be as short as possible and in any case not more than 20 s.
Mount the OMD-2008 EV-FC Computer Unit by means of M6 or M8 screws on to
a rigid vertical surface and preferably with the display panel of the monitor at eye
level. For service and maintenance sufficient space to all sides should be
available.
Fig. 2a: Dimensions of Computer Unit
Computer Unit and Measuring Cell assembly should be mounted close to each
other.
Issue: 08.07.2015
DECKMA HAMBURG GmbH
(REFER TO FIG. 2 AND FIG. 3)
Instruction Manual OMD-2008 (EV, FC, MCU Versions)