Thermon Terminator ZS Installation Procedures

In line splice/end termination kit

Advertisement

Quick Links

Terminator
ZS/ZE
TM
In Line Splice/End Termination Kit
INSTALLATION PROCEDURES
For In-Line Splice Connection and End Termination Applications

Advertisement

loading
Need help?

Need help?

Do you have a question about the Terminator ZS and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Thermon Terminator ZS

  • Page 1 Terminator ZS/ZE In Line Splice/End Termination Kit INSTALLATION PROCEDURES For In-Line Splice Connection and End Termination Applications...
  • Page 2 PETK-1 for BSX, RSX, VSX, VSX-HT maintenance, a ground-fault protection device is required. • Installation must comply with Thermon requirements and be PETK-2 for KSX, HTSX, installed in accordance with the regulations as per the norm...
  • Page 3 Terminator ZS/ZE INSTALLATION PROCEDURES Locate bus connection (HPT and FP only) and Insert cable into expediter. If mounted on Slide expediter toward pipe and route cable cable as shown. Cut end of cable at angle to bottom or side of pipe, punch out weep hole. through support base entry.
  • Page 4 European Headquarters: Boezemweg 25 • PO Box 205 • 2640 AE Pijnacker • The Netherlands • Phone: +31 (0) 15-36 15 370 Corporate Headquarters:100 Thermon Dr • PO Box 609 San Marcos, TX 78667-0609 • Phone: 512-396-5801 • 1-800-820-4328 For the Thermon office nearest you visit us at . . . www.thermon.com Form PN50816U-0718 ©...

This manual is also suitable for:

Terminator ze