Elbow splice kit for electrically heated tubetrace bundles (5 pages)
Summary of Contents for Thermon Terminator ZS
Page 1
Terminator ZS/ZE In Line Splice/End Termination Kit INSTALLATION PROCEDURES For In-Line Splice Connection and End Termination Applications...
Page 2
PETK-1 for BSX, RSX, VSX, VSX-HT maintenance, a ground-fault protection device is required. • Installation must comply with Thermon requirements and be PETK-2 for KSX, HTSX, installed in accordance with the regulations as per the norm...
Page 3
Terminator ZS/ZE INSTALLATION PROCEDURES Locate bus connection (HPT and FP only) and Insert cable into expediter. If mounted on Slide expediter toward pipe and route cable cable as shown. Cut end of cable at angle to bottom or side of pipe, punch out weep hole. through support base entry.
Need help?
Do you have a question about the Terminator ZS and is the answer not in the manual?
Questions and answers