Lighted power connection/end termination kit for power connection or end termination applications (5 pages)
Summary of Contents for Thermon Terminator ZP/FAK-1
Page 1
Terminator ZP/FAK-1 For Bulkhead Entry of Electrically Heated TubeTrace® Bundles INSTALLATION PROCEDURES...
Page 2
Terminator ZP/FAK-1 Dimensions The following installation procedures are suggested guidelines for the installation of the Terminator ZP/FAK-1 Bulkhead Entry Kit. Receiving, Storing and Handling 1. Inspect materials for damage incurred during shipping. 2. Report damages to the carrier for settlement.
INSTALLATION PROCEDURES The Terminator ZP/FAK-1 Split Bulkhead Entry Kit is designed to Installation Precautions make a waterproof seal over the end of TubeTrace and terminate • To minimize the potential for arcing on electrical heat tracing Thermon electric heat trace in an approved junction box. Review and fire caused by product damage or improper installation, Instructions prior to installation.
Page 4
Terminator ZP/FAK-1 Mount Screw Silicone and Washers Gasket FAK-1 Top Cover Expediter Base O-Ring FAK-1 FAK-1 Base Bottom Cover Weep Hole Install RTV silicone and gasket, cutting off excess. Mount expediter base with o-ring to FAK-1 Assemble FAK-1 top, tubing bundle, and FAK-1 Apply RTV sealant to both halves.