Elbow splice kit for electrically heated tubetrace bundles (5 pages)
Summary of Contents for Thermon Terminator ZP
Page 1
Terminator Power Connection Kit INSTALLATION PROCEDURES For Power Connection, In-Line Splice Connection, T-Splice Connection, or End Termination Applications...
Grommet • Component approvals and performance ratings are based on Support Base with O-Ring the use of Thermon specified parts only. User supplied power Junction Box Lid connection fittings must be listed or certified for intended use. Junction Box Base with O-Ring •...
Page 3
Terminator INSTALLATION PROCEDURES HPT and FP Only Connection Insert cable into expediter. If mounted on Slide expediter toward pipe and route cable Locate bus connection (HPT and FP only) and bottom or side of pipe, punch out weep hole. through support base entry. cable as shown.
Page 4
Terminator INSTALLATION PROCEDURES Mount junction box base on expediter. Make sure For power connection applications: Install power Install quick mount terminal blocks. to align slots to properly orient junction box base. connection fittings (user supplied) and pull in Tighten nut securely. power and ground wires.
Page 5
Terminator INSTALLATION PROCEDURES Two Cable Layout Tips Locate bus connection (HPT and FP only) and cable Insert two cables into expediter. as shown. Cut end of cable at angle to aid in piercing Note: For HPT and FP cable, exchange grommet grommet.
Page 6
THERMON . . . The Heat Tracing Specialists ® • • 100 Thermon Dr. PO Box 609 San Marcos, TX 78667-0609 • • For the Thermon office nearest you Phone: 512-396-5801 Facsimile: 512-396-3627 1-800-820-HEAT visit us at . . .
Need help?
Do you have a question about the Terminator ZP and is the answer not in the manual?
Questions and answers