Scope Of Delivery - NBN Fluke CS400 Hardware Manual

Kiln shell temperature monitoring
Table of Contents

Advertisement

CS400 System
Hardware Manual, Rev. 1.0, Sep 2021

2.6 Scope of Delivery

The scope of delivery for a CS400 system includes the following:
CS400 Kit
Basic Hardware Kit
Tool Kit
Documentation
16
Linescanner (RAYTMP150HRR1)
7.5 m (24.6 ft) Ethernet cable
7.5 m (24.6 ft) power cable
7.5 m (24.6 ft) alarm/trigger cable
Spare window for linescanner (reorder: S-MP-WK-HR)
Protective Housing (A-MP-ENC)
stainless steel box
protective window (reorder: S-MP-WK-ENC)
grommet kit
adjustable mounting bracket
System connection box in the field (A-CS-CONBOX)
Fiber optic / RJ45 Ethernet converter:
4x Ethernet, 2x fiber optic channels
Power Supply 100/240 VAC to 24 VDC, 2.5 A
Fiber optic patch cable with SC connector, 2 m (6.6 ft) - 2 pieces
Position indicator with junction box (A-CS-SYSECPI)
Fiber Optic Converter Box in the control room
Fiber optic / RJ45 Ethernet Converter:
4x Ethernet, 2x fiber optic channels
Power Supply 110/230 VAC to 24 VDC, 1.25 A
Ethernet patch cable, 2 m (6.6 ft)
Fiber optic patch cable with SC connector, 2 m (6.6 ft) - 2 pieces
Hex key wrench 2.5 mm
Hex key wrench 4 mm
Hex key wrench 5 mm
Wrench 7x8 and 10x13
Key for locking/unlocking enclosure doors
CS400 hardware and software manual
MP linescanner operating instructions,
MP protocol manual (on data carrier only)

Advertisement

Table of Contents
loading

Related Products for NBN Fluke CS400

Table of Contents