Download Print this page

OLT Gardener's Shed GAR88-FJ-METAL Assembly Manual page 9

8x8 metal roof - finger jointed siding

Advertisement

7.
Attach Floor Runners to completed floor frame.
There are 2 Floor Runners per 91" side and 5 complet-
ed runners in total. Use 3 - 2 1/2" screws per Floor
Runner. Make sure Runners are flush with outside,
front and rear floor framing but not overhanging.
8.
Complete all Floor Runners.
Foundations
Note: The floor will be flipped over and floor
runners will sit on your foundation.
important
to
note
foundation is critical. Choosing a foundation will
vary between regions. Typical foundations can
be concrete pads or patio stones positioned
underneath the floor runners.
10.
Position Plywood Floor pieces (4) on top of
completed floor joists. Plywood is cut slightly small-
er than floor framing. Keep plywood seams tight.
Toll Free 1-888-658-1658
It is
that
having
a
level
www.outdoorlivingtoday.com
Parts (Steps 7 - 9)
Floor Runner Short
(1 1/2" x 3 1/2" x 31") x 5
Floor Runners Long
(1 1/2" x 3 1/2" x 60") x 5
Concrete Slab
Foundation
9.
With Floor Runners attached, carefully flip
the floor over and place on your foundation.
Caution: you will need 2 people to assist you.
Be careful when laying floor down not to bend
or twist floor. When in place, level floor
completely.
Door goes
on 96" side
Parts (Steps 10 - 11)
Floor Plywood Small
(5/8" x 45 3/8" x 20 7/8") x 2
Floor Plywood Large
(5/8" x 45 3/8" x 74 7/8") x 2
Page 9
Hardware (Steps 7 - 9)
S1 - 2 1/2" Screws
x 30 total
plywood
pushed together
at seams.
Hardware (Steps 10 - 11)
S2 - 1 1/4" Screws
x 46 total
sales@outdoorlivingtoday.com

Advertisement

loading