Download Print this page

OLT Gardener's Shed GAR88-FJ-METAL Assembly Manual page 12

8x8 metal roof - finger jointed siding

Advertisement

16.
Position a 2nd Solid Wall into place on plywood floor. Butt both vertical wall studs of side and
rear walls together and attach with 3 - 2 1/2" screws. Screw at the bottom, middle and top of stud to
secure properly.
2x3 wall framing flush
with floor framing.
18.
Continue positioning and securing wall panels around your
floor. Attach wall studs together as per Step 16. Be sure that rear
wall panels fit between the side wall panels (sandwiched).
Toll Free 1-888-658-1658
Do Not Attach
Walls To Floor
Until Step 25.
17.
With the corner wall
attachment
complete,
position a third wall
panel in place. Wall
siding should overhang
floor by approximately
1/2".
When positioned
correctly, attach both
rear wall panel studs
together as per Step 16.
www.outdoorlivingtoday.com
Page 12
Optional: Caulking seams will
help prevent moisture from
entering at seam. Caulking not
included in kit. This will help the
longevity of your shed.
Wall panel will
sit flush with
floor framing at
Front of shed.
19.
Complete all side
and rear wall attachments.
sales@outdoorlivingtoday.com

Advertisement

loading