Download Print this page

OLT Gardener's Shed GAR88-FJ-METAL Assembly Manual page 8

8x8 metal roof - finger jointed siding

Advertisement

2.
When correctly positioned, attach each Joist with 4 - 2 1/2" screws (2 per end).
4.
Attach each large and small floor joist frame
together with 6 - 2 1/2" screws per section.
5.
Complete all large and small frame
attachments. Screw each completed
section together with 8 - 2 1/2" screws.
Toll Free 1-888-658-1658
You can find the
Square Drive Bit
for the screws in
with the Hardware
Kit Bag.
3.
illustrated at left. There are 2 larger and
2 smaller Frame Sections. The Footprint
for the floor when attached together will
be 96" wide x 91" deep.
www.outdoorlivingtoday.com
Page 8
Lay out Floor Joist Frames as
91"
6.
When completed, your floor footprint
should be 96" wide x 91"deep.
sales@outdoorlivingtoday.com
Door goes
on 96" side

Advertisement

loading