Download Print this page

OLT Gardener's Shed GAR88-FJ-METAL Assembly Manual page 26

8x8 metal roof - finger jointed siding

Advertisement

53.
Overhang the Metal Roof Panels past the Battens on sides approximatley 1". Adjust panels side-
to side tto achieve desired width. Overall width past the Battens can vary from 1" - 3" depending on your
preference. The overhang over the side of the shed will be set by the Metal Roof Hangars, but should be
approximatley 4" on the side of shed.
Bead of Caulking
54.
Once the Metal Roof is spaced correctly from side-toside and top-to-bottom, lift 2 panels up and run
a bead of caulking down the overlapping seams of each panel to seal the joints, Place panels down one
by one once seam is caulked. You will likely need assistance from a helper for this step. Caulk each seam.
Important: Metal Roof Hangers
will be removed in Step 56.
55.
Using 6 - 2" Metal Screws and 1/4" Nut Driver (included), partially
secure Metal Roof Panels to 2nd row of Battens from top. Only fasten
screws halfway so that Metal Roof Hangers can be removed. Metal screw
is self-tapping, screw into center of Battens.
Toll Free 1-888-658-1658
4"of overhang set by
metal roof hangars
www.outdoorlivingtoday.com
Bead of Caulking
Screw into center of
Battens. 2nd row
from top.
Page 26
Hardware (Step 55)
2" - Metal Roof Screws
x 6
sales@outdoorlivingtoday.com

Advertisement

loading