Requirements For The Coolant - Cebora PLASMA PROF 164 HQC Instruction Manual

Hide thumbs Also See for PLASMA PROF 164 HQC:
Table of Contents

Advertisement

Available languages

Available languages

65
®

3.5 Requirements for the coolant

The power source is supplied without coolant: the customer is responsible for filling the tank
before using the system.
Use only CEBORA coolant (art. 1514) and carefully read the MSDS in the appendix for
information about how to use it safely and store it properly.
The inlet to the 10-liter tank is on the back of the power source, as shown in fig. 3.8.
Fill to the maximum level and top up after the first start, to compensate for the volume of liquid
present in the hoses.
NOTE: small amounts of liquid will leak while using the system, and especially when replacing
the torch or consumables. Top up weekly to the max. level.
NOTE: the coolant must be completely replaced after 6 months, regardless of the number of
system running hours.
3300945-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

954

Table of Contents