3 Installation

Only skilled personnel should install the machine.
All connections must be compliant with current standards and made in full observance of the
safety laws (see CEI 26-23 / IEC-TS 62081).
Make sure that the power cable is disconnected during all stages of installation.

3.1 Unpacking and assembly

To lift the power source, unscrew the 4 screws on the bottom (See fig. 3.1), remove the 4 corner
pieces to the striker and re-tighten; then use a lifter as shown in the figure. Do not use the handle
as an anchor point.
The cooling system draws air from the back of the power source and expels it through the front
grates. Place the power source so as to have an ample ventilation zone, and keep it at least 1 m
away from any walls.
Fig.3.0
3300945-A