Hot-Swap Power Supply Installation - Lenovo ThinkAgile CP Part Replacement And Component Maintenance Procedures

Table of Contents

Advertisement

Before installing a hot-swap power supply:
1. Touch the static-protective package containing the new hot-swap power supply to any unpainted
surface on the outside of the storage.
2. Take the new hot-swap power supply out of the package and place it on a static-protective surface.
Procedure performed by: Customer or field service
To install a hot-swap power supply, complete the following steps:
Step 1.
Ensure that the handle is in the open position.
Step 2.
Press the release tab down, and slide the new hot-swap power supply into the bay at the same
time until the release latch clicks into place.
Figure 38. Hot-swap power supply installation (1)
Step 3.
Close the handle.
.
Chapter 6
Storage block maintenance procedures
65

Advertisement

Table of Contents
loading

Table of Contents