York Millennium YDAS 410 Installation Operation & Maintenance page 107

Air cooled screw liquid chillers air cooled screw hermetic
Table of Contents

Advertisement

NOTE: Under some conditions, the lag compressor
group may be sent load signals before the lead
compressor reaches the required percentage
of full load, if chilled liquid temperature is not
brought within the control range after 10 min-
utes of run time. For more details, see Section
8.2 – Lag Panel Start Point.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Millennium ydas 490

Table of Contents