Operating Procedure; G3000/Pfi9D/Eclipse Machine Setup; Using High Pressure Co2 Cylinders With Syphon - Ultratec Eclipse G3000 Operator's Manual

Low fog generator
Hide thumbs Also See for Eclipse G3000:
Table of Contents

Advertisement

OPERATING PROCEDURE

G3000/PFI9D/ECLIPSE machine setup

1) Remove the 4" Adapter off the front of the fog machine (if
equipped).
2) Place the fog machine output end directly against the foam gasket
of the ECLIPSE aligning the output nozzle with the hole.
TECH TIP: Proper alignment can be observed by shining a flashlight
into the 10" output opening of the ECLIPSE.
3) Connect the power cable by connecting the grey Neutrik end to
the fog machine and the black Neutrik end to the Eclipse. Turn
until you hear the click when it locks.
4) Insert the fluid tube into a jug of Molecular Fog Fluid and secure it making sure the fluid filter
reaches the bottom of the jug.
5) Heat up the fog machine by turning the power switch to the on position. The fog machine will take
approximately 10 minutes to fully heat up.
Note: For G3000 system a 20-amp circuit is required for 120-volt operation.
For PFI9D system a 15-amp circuit breaker is required.
Using High Pressure CO2 cylinders with syphon tube
1) Connect the CO2
2) Using a white nylon or black fiber washer, connect the other end of the supply
hose to the high pressure CO2 tank.
3) Tighten both CO2 supply fittings snug with an appropriate wrench.
4) Open valve on CO2 tank slowly to check for leaks then open fully, by turning
counterclockwise.
8
www.ultratecfx.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eclipse pfi9d

Table of Contents