Operating Procedure

1. The fog machine must be connected to a grounded supply of at least 15 amps
free of any electrical interference. Due to the heavy loads minimize length and
maximize size of extension cords.
2. Open a 4L or 20 Litre (5 Gallon) container of Ultratec Special Effects fog fluid and
insert the fluid pickup tube into the spout of the fluid container.
3. With the Optional Remote Handset connected to the rear panel labeled Remote
or by watching the green LED located on the rear panel allow the unit to heat.
(When using DMX the Remote is not required).
4. Activate the Power switch located on the rear panel. The green LED on the back of the 9D and
Handset indicator will illuminate to indicate the presence of power. If the Handset
indicator does not illuminate, ensure the connector is properly inserted.
5. The Handset indicator and the green LED on the back of the 9D will begin to flash slowly, but will
speed up when the fog machine is ready to operate. After approximately 9 minutes, the fog machine
will be fully heated and is ready for full output; the indicator will be on solid.
6. It may be necessary to prime fluid into the system to expel any air. The Variflow control on the
remote handset should be set to the full position. A dry hose can take between
45-60 seconds to prime. This only needs to be done if the unit was left to run dry.
NOTE: In order to prime the fog machine, the green LED on the back of the 9D or red Handset LED
must be on solid, which indicates that the fog machine is fully heated.
7. To adjust the depth of the hose, simply loosen Nut 'A' and slide up or down the hose and
retighten. Be careful not to pinch off the flow of fluid.
Operating Procedure w/ Air Option (If Installed)
A) Mount the Regulator Bracket to a wall or other secure
location with the condensate trap hanging down.
B) Attach the female coupler to the male coupler of the
Power Fog Industrial w/ Air Option or Power Fog Industrial
9D w/ Air Option.
C) Attach the air hose to the male coupler of the mounted
regulator.
D) Adjust for the desired air pressure (typically 25-50 psi).
3
www.ultratecfx.com
A
D
A
C
A
A
B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pfi9dClf 4460Clf 4456Clf 4461Clf 4457

Table of Contents