GS-W1002 PARTS CHECK LIST NO. Name Description Size Material Remarks MP139 MAIN POST Φ139.8 X L6000 Galvanized Steel UV polyester powder coating RC22 1 SET MULTI COMPOUND ROPE Φ22, Φ20 Nylon NCP150 PLASTIC POST CAP Φ150 X H90 MC Nylon...
Page 3
- Protection of steel component from corrosion. ● Measure In case of the appearance the defect detail is repaired usually within 3 days after checking. GSWEB PLAYGROUND EQUIPMENT 1046-3, Najeon-ri, Saengnim-myeon, Gimhae-si Gyeongsangnam-do, 621-821, Republic Of Korea Tel) +82. 55. 326. 9096~7 Fax) +82.
Page 4
GS Web Nets help bring movement, balance, exercise and fun back into the playground. Ages: 6 to 12 years Capacity: 46 children Size: L: 32' 6" / 9.9m W: 32' 6" / 9.9m H: 18' 8" / 5.7m Figure-1: Completed Net GSWeb Playground Equipment...
This height is based on the centre of gravity height of the maximum user. Figure-2: Safety area GSWeb Playground Equipment...
Page 6
MODEL NO. SINGLE MAST NET CLIMBER Foundation Information GS-W1002 Foundation Please refer to GS-W1002 drawing for installation dimension Pole Figure-4: Foundation section view Level Line Finished ground Finished Grade surface layer Figure-3 : Excavate enough materials to allow for proper depth...
Position anchor plate on concrete footing " " 22' 11-1/2" = 7000mm [CF] 'L" anchor hole 32' 5-3/4" = 9900mm Front edge of anchor plate must be installed 4" (100mm) from the edge of concrete footing. Anchor Plate position GSWeb Playground Equipment...
Page 8
1 frame (27-½" / 700mm L x 27-½" / 700mm W x 31-½" / 800mm H) 7-⅞" *Use ½" (min) plywood; not included in package 5-⅞" NOTE: Use anchor plate as guide for exact measurements. (a) wood jig for Anchor plate (b) wood support frame for concrete Figure-6: Wood support frame GSWeb Playground Equipment...
Page 9
Allow 3-5 days for concrete to cure before proceeding to next step. [concrete footing work] *Concrete is to be wet concrete with minimum 25 MPA / 3500PSI. Pour wet concrete in the wooden support frame Figure-7: Concrete footing work GSWeb Playground Equipment...
Page 10
SINGLE MAST NET CLIMBER Remove Wood Support Frame GS-W1002 Remove wood support frame from dry concrete blocks After concrete has cured enough, remove frames and replace soil around the footings to subgrade level Figure-8: remove wood support frame GSWeb Playground Equipment...
Page 11
Anchor Plate Assembly GS-W1002 (a) Anchor Plate Figure-9: Concreted blocks - Clean threads of "L"-Anchors (b) Post plate (b) Post plate (a) Anchor Plate Figure-10: Attach Anchor plate to footing with flat washer, locking washer and nut. GSWeb Playground Equipment...
Page 12
SINGLE MAST NET CLIMBER Post Assembly GS-W1002 Post Assembly Insert Post following nylon string STEP-2 STEP-1 Nylon string Figure-12: Insert Post following Nylon string Figure-11: Find Nylon String NOTE: Remove string prior to placing cap on post. GSWeb Playground Equipment...
Page 13
(already attached to the top of the net) into the mast’s top end. STEP-3 Figure-14: U-bolt assembly. STEP-4 Note: Rubber mallet may be required to insert cap into post. Figure-13: Insert Post into the Center of Net. Figure-15: Post cap assembly GSWeb Playground Equipment...
Page 14
Safety cable Assembly After successfully preparing the net and mast assembly, attach safety cable with M22 X L110 H/T Bolt to Anchor plate as shown below M22 X L110 H/T Bolt Figure-16: Attach cable to (A) (B) (C) GSWeb Playground Equipment...
Page 15
MODEL NO. SINGLE MAST NET CLIMBER Standing the net GS-W1002 It is strongly recommended that 5-7 workers or a machine be used to lift the net into place. [Working Process] Figure-18: Centre Post Figure-19: Safety cables attached GSWeb Playground Equipment...
Page 16
SINGLE MAST NET CLIMBER Stand Net up GS-W1002 After standing up the Net, Attach remaining safety rope and Turnbuckles Figure-21: Loosen Turnbuckle: all the way (about 100mm), leaving only 4 or 5 threads attached Figure-20: Stand Net up GSWeb Playground Equipment...
Page 17
Tightening Turnbuckles NOTE: Make sure post is level before tightening and remains level during process. (a) + (a) Tighten Cable with Turnbuclke at the Same time (b) + (b) Tighten Cable with Turnbuclke at the Same time GSWeb Playground Equipment...
Page 18
After Net structure tension is completed, the net will stretch slightly over the first four weeks of use. Following this initial period, the net needs to be fully re-tensioned by Turnbuclke after 1 year. Figure-24: completed Net GSWeb Playground Equipment...
GS-W1002 1: main post 7: H/T bolt,nut washer 2: multi compound rope 8: U-bolt,nut,washer 3: post cap 9: main post plate 4: turn buckle 10: L-anchor bolt,nut,washer 5: anchor shackle 11: Anchor plate 6: shock proof ring GSWeb Playground Equipment...
SINGLE MAST NET CLIMBER Maintenance GS-W1002 A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope. Periodic checks on tension will assist in the durability of the product. GSWeb Playground Equipment...
Page 22
Repairs during operation that could put the safety of maintenance personnel of the public at risk, should be avoided. F. Equipment alterations Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out after consultation with the manufacturer or a compete person. GSWeb Playground Equipment...
Need help?
Do you have a question about the GS-W1002 and is the answer not in the manual?
Questions and answers