Download Print this page
GSWeb Playground Equipment GS-W1001-1 Installation Manual

GSWeb Playground Equipment GS-W1001-1 Installation Manual

Net climber, single mast

Advertisement

Quick Links

Net Climber – Single Mast
INSTALLATION MANUAL
Safety Checklist after first assembly
● Test intervals of Safety: 6 months
● Test Component and contents:
1. Removing the reticulated system:
- Check of removing condition each rope
- Screwing the turn buckle and conversion the turnbuckle
in anchors plate(see for this workstep turnbuckle assembly)
2. Abrasion condition of rope:
- Checking of all rope surface
- Strengthened of rope: Coating on the surface
3. Attachment condition of the anchors plate and turnbuckle
4. Screwing condition of all bolt
5. Galvanizing condition of the steel component:
- Protection of steel component from corrosion.
● Measure
In case of the appearance the defect detail is
repaired usually within 3 days after checking.
Caution!!
You have to construct foundation same level.
You have to keep foundation certain distance.
GSWeb Playground Equipment
65, Saengnim-daero 259beon-gil, Saengnim-Myeon
Gimhae-si, Gyeongsangnam-do, Republic of Korea
Tel) +82 (0)55 326 9025
E-mail) gswebinfo@chol.com
Fax) +82 (0)55 326 9026
Website) www.gsweb21.com
MODEL NO.
GS-W1001-1
Rev_0
2015.05
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the GS-W1001-1 and is the answer not in the manual?

Questions and answers

Summary of Contents for GSWeb Playground Equipment GS-W1001-1

  • Page 1 You have to construct foundation same level. You have to keep foundation certain distance. 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 2 Use zone : L : 27‘ 7" / 8.40m (ASTM) W : 27‘ 7" / 8.40m ▲ Completed Net 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 3 Imperial/Metric conversion 6' = 1830mm 11' = 3350mm 33' 11" = 10360mm 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 4 Net Climber – Single Mast Foundation Information GS-W1001-1 Rev_0 2015.05 Foundation Caution!! Please refer to GS-W1001-1 drawing for exact installation dimensions You have to construct foundation same level. You have to keep foundation certain distance. Pole ▼ Foundation section view Level Line Finished Grade...
  • Page 5: Foundation Layout

    4" / 100mm from edge of concrete footing. No.23: Anchor Plate position Anchor plate 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 6 (a) wood jig for Anchor plate (b) wood support frame for concrete Concrete Foundation ▲ Wooden support frame 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 7 *Concrete is to be wet concrete with minimum 25 MPA / 3500PSI ▲ Concrete footing work 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 8 After concrete has cured enough, remove frame and replace soil in area around footing to subgrade level Concrete Footing ▲ Remove wooden support frame 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 9 (a) Anchor Plate ▲ Attach Anchor plate to footing with flat washer, locking washer and nut 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 10 ▲ Insert Post following Nylon string NOTE: Remove string prior to placing cap on post 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 11 Main Post ▲ Insert Post into the Center of Net ▲ Post cap assembly 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 12 No.63: Shackle No.101: H/T Bolt ▲ Attach cable to (A) (B) (C) 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 13 (including Shock Proof) No.21: Main Post Plate ▲ Centre Post ▲ Safety cables attached Concrete Footing 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 14 4 or 5 threads attached No.61: Turn Buckle ▲ Stand Net up 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 15 Tighten Rope with Turnbuckles at the Same time NOTE: Make sure post is level before tightening and remains level during process 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 16: Maintenance Information

    Following this initial period, the net needs to be fully re-tensioned by Turnbuckle after 1 year. ▲ Completed Net 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 17 Mast Foot Main Post Plate No.101: H/T Bolt No.23: No.41: Anchor Plate L-Anchor Set 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 18: Maintenance

    Periodic checks on tension will assist in the durability of the product 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 19 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...
  • Page 20 Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out after consultation with the manufacturer or a compete person. 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@chol.com GSWeb Playground Equipment Gimhae-si, Gyeongsangnam-do, Republic of Korea Fax) +82 (0)55 326 9026 Website) www.gsweb21.com...