GS-W3001 PARTS CHECK LIST NO. Name Description Size Material Remarks MP139 MAIN POST Φ139.8 X L4200 Galvanized Steel UV polyester powder coating RC22 1 SET MULTI COMPOUND ROPE Φ22, Φ20 Nylon NCP150 PLASTIC POST CAP Φ150 X H90 MC Nylon...
Page 3
MODEL NO. TRIPLE MAST NET CLIMBER INSTALLATION MANUAL GS-W3001 Safety Checklist after first assembly GSWeb Playground Equipment ● Test intervals of Safety: 6 months 1046-3, Najeon-ri, Saengnim-myeon, ● Test Component and contents: Gimhae-si Gyeongsangnam-do, 1. Removing the reticulated system: 621-821, Republic Of Korea - Check of removing condition each rope Tel) +82.
Page 4
Nylon cables with UV guard and the landing surface is H: 12' 10" / 3.90m textile-reinforced flexible rubber material. Use zone: The GS-W3001 features GS Web Technology which L: 53' 6" / 16.30m includes the highest steel content and the W: 55' 6" / 16.30m...
Page 5
This distance in based on the centre of gravity height of the maximum user. Metric/Imperial 62, 2 4 conversion: Figure-2: Safety area 1830mm = 6' 66, 9 9 4000mm = 13' 1-1/2" 5300mm = 17' 4-5/8" GSWeb Playground Equipment...
Page 6
MODEL NO. TRIPLE MAST NET CLIMBER Concrete Footing Information GS-W3001 Foundation Please refer to GS-W3001 drawing for installation dimension Pole Figure-4: Foundation section view Level Line Finished ground Finished Grade surface layer Figure-3: Excavate enough material for proper depth of footings Also ensure that there is enough space to allow the frame to be positioned properly.
Position anchor plate on concrete footing Metric/Imperial conversion: " " 4000mm = 13' 1-1/2" [CF] 'L" anchor hole 5300mm = 17' 4-5/8" Front edge of anchor plate must be installed 4" (100mm) from the edge of concrete footing. Anchor Plate position GSWeb Playground Equipment...
1 frames (5' 11" / 1800mm L x 5' 11" / 1800mm W x 39-½" / 1000mm H) *Use ½" (min) plywood; not included in package 5-⅞" (a) wood jig for Anchor plate NOTE: Use anchor plate as (b) wood support frame for concrete guide for exact measurements. Figure-6: Insert "L" Anchor bolts GSWeb Playground Equipment...
Page 9
Allow 3-5 days for concrete to cure before proceeding to next step. *Contrete is to be wet concrete with minimum 25 MPa / 3500 PSI. [concrete footing work] Pour wet concrete in the wooden support frame Figure-7: Concrete Footing work GSWeb Playground Equipment...
Page 10
TRIPLE MAST NET CLIMBER Remove the wood support frame GS-W3001 Remove wood support frame from dry concrete blocks After concrete has cured enough, remove frames and replace soil around footing to subgrade level Figure-8: Remove wood support frames GSWeb Playground Equipment...
Page 11
GS-W3001 (a) Anchor Plate igure-9: Concreted blocks - Clean threads of "L"-Anchors (b) Post plate (b) Post plate (a) Anchor Plate Anchor Plate Assembly Figure-10: Attach Anchor plate to footing with flat washer, locking washer and nut. GSWeb Playground Equipment...
Page 12
TRIPLE MAST NET CLIMBER Post Assembly GS-W3001 Post Assembly Insert Post following nylon string STEP-1 STEP-2 Nylon string Figure-12: Insert Post Figure-11: Find Nylon String following Nylon string NOTE: Remove string prior to placing cap on post. GSWeb Playground Equipment...
Page 13
(already attached to the top of the net) into the mast’s top end. STEP-3 Figure-14: U-Bolt assembly. STEP-4 Note: Rubber mallet may be required to insert cap into post. Attaching Cap to Post Figure-13: Post Assembly Figure-15: Post cap assembly. GSWeb Playground Equipment...
Page 14
This will be repeated for the other three posts as outlined and mast assembly, attach safety cable with M22 X L110 H/T BOLT to Anchor plate as shown below M22 X L110 H/T BOLT Figure-16: Attach cable to (A) (B) GSWeb Playground Equipment...
Page 15
Safety Cable Attachment GS-W3001 It is strongly recommended that a machine be used to lift the net into place. [Working Process] STEP-2 STEP-1 Figure-19: Figure-18: Repeat Step 1 on the second post (Step 2 Safety cable attachment GSWeb Playground Equipment...
Page 16
(about 100mm), leaving only 4 or 5 threads STEP-2 attached STEP-1 STEP-3 STEP-5 STEP-4 Figure-20: Stand remaining posts up (Step 3) & (Step 4) (Step 1) (Step 2) (Step 3) (Step 4) (Step 5) GSWeb Playground Equipment...
Page 17
Tighten Cable with Turnbuckle at the Same time NOTE: Make sure post is level before tightening and remains level during process. Use turnbuckles to straighten post to level. Then turn each turnbuckle evenly until net is tight. GSWeb Playground Equipment...
Page 18
After Net structure tension is completed, the net 6 2, 2 4 will stretch slightly over the first four weeks of use. Following this initial period, the net needs to be fully re-tensioned by Turnbuckle 66, 99 after 1 year. Figure-24: Completed Net GSWeb Playground Equipment...
Page 19
MODEL NO. TRIPLE MAST NET CLIMBER Tensioning & Maintenance information GS-W3001 GSWeb Playground Equipment...
GS-W3001 1: main post 7: H/T bolt,nut washer 2: multi compound rope 8: U-bolt,nut,washer 3: post cap 9: main post plate 4: turn buckle 10: L-anchor 5: anchor shackle bolt,nut,washer 6: shock proof ring 11: Anchor plate GSWeb Playground Equipment...
Page 21
GS-W3001 A weekly check of the activity net is recommended to ensure that no acts of vandalism have damaged the rope. Periodic checks on tension will assist in the durability of the product. 62, 24 66, 99 GSWeb Playground Equipment...
Page 23
Repairs during operation that could put the safety of maintenance personnel of the public at risk, should be avoided. F. Equipment alterations Alterations to parts of a piece of equipment or structure that could affect the essential safety of the equipment should only be carried out after consultation with the manufacturer or a compete person. GSWeb Playground Equipment...