GS-N201-1 Rev_0 Features 2018.04 The butterfly features GS Web Technology which includes the highest steel content and the strongest connection materials in the industry, including a steel-wire core in our edge ropes and connection points crushed in place with over...
Page 2
MODEL NO. THE BUTTERFLY Safety area and Fall Height zone GS-N201-1 Rev_0 Safety area 2018.04 The requirements for space and safety clearances are taken from BS-EN 1176-1 / ASTM-F1487. The use zone for stationary play equipment shall extend no less than 72 in.
Page 3
MODEL NO. THE BUTTERFLY Foundation Information GS-N201-1 Rev_0 !Attention Foundation Detail Foundation 1 ~ 7 2018.04 Please refer to following details for foundation work. Pouring Concrete Base plates are welded to the Rolling Hill’s pipe. After assembling pipes and nets, fix the structure on the concrete.
Page 4
MODEL NO. THE BUTTERFLY Foundation Information GS-N201-1 Rev_0 2018.04 1700 1 x 6 - 1/2" x 125L Ø Ø Ø SET ANCHOR SAND SAND 6 x 2 - 3/8" x 100L SET ANCHOR CONCRETE CONCRETE Foundation 1 Foundation 2 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@gswebplay.com...
Page 5
MODEL NO. THE BUTTERFLY Foundation Information GS-N201-1 Rev_0 2018.04 60.5 114.3 Ø Ø 60.5 Ø 2 x 4 - 3/8" x 125L SAND SET ANCHOR SAND 2 x 4 - 3/8" x 125L SET ANCHOR 1 x 6 - 1/2" x 125L...
Page 6
MODEL NO. THE BUTTERFLY OVERALL ASSEMBLY – PIPE GS-N201-1 Rev_0 !Attention Overall Assembly 2018.04 It is very important to keep the stickers attached on the parts on until Assemble the parts in the following order: the installation is completed. If the stickers are detached during the installation, it might be difficult to 1.
Page 7
MODEL NO. THE BUTTERFLY OVERALL ASSEMBLY - PIPE GS-N201-1 Rev_0 Overall Assembly 2018.04 Assemble the pipes in alphabetical order. 1. Check the pipes’ numbers on Stickers on them. 2. As below picture, Line up the pipes and Connect the pipe to the next pipe 3.
Page 8
MODEL NO. THE BUTTERFLY OVERALL ASSEMBLY - Net GS-N201-1 Rev_0 Overall Assembly - Net 2018.04 1. Install the net in the correct position. NET A DISK 65, Saengnim-daero 259beon-gil, Saengnim-Myeon Tel) +82 (0)55 326 9025 E-mail) gswebinfo@gswebplay.com GSWeb Playground Equipment...
Page 9
MODEL NO. THE BUTTERFLY OVERALL ASSEMBLY - Net GS-N201-1 Rev_0 Overall Assembly - Net 2018.04 Assemble the parts in the following order: 1. Check the net’s name. 2. Attach the net to the proper location of pipe in order as below picture.
Page 10
MODEL NO. THE BUTTERFLY OVERALL ASSEMBLY - Disk GS-N201-1 Rev_0 Overall Assembly (for Climbing Ropes) 2018.04 1. Fix the Climbing ropes onto the concrete. Set Anchor ! Attention Do not drill holes on the concrete first. After checking the tension of the stair net and setting its distance, put the Set Anchor on concrete.
MODEL NO. THE BUTTERFLY Maintenance GS-N201-1 Rev_0 2018.04 A. General safety measures On the playground there should be a sign(pictogram) giving the following information: a) general emergency telephone number; b) telephone number to contact maintenance personnel; c) name of the playground;...
Page 12
MODEL NO. THE BUTTERFLY Maintenance GS-N201-1 Rev_0 C. Routine maintenance 2018.04 To reduce accidents, the owner or operator should ensure that an appropriate routine maintenance schedule is established, implemented and maintained. This should take into account local conditions and the manufacturer's instructions that can affect the necessary inspection frequency.