Raising - Upright ULII-25 Service & Parts Manual

Portable personnel lifts
Table of Contents

Advertisement

Figure 3-17: Releasing the Strut

Raising

1. Set the caster brakes by stepping on the caster brake
lever. Check to insure that the Tilt Back Frame does
not roll.
2. Remove one outrigger from its storage pocket and
install it in the lifting pocket at the front of the
machine. Slide outrigger in until it locks in place.
3. While another person lifts up slightly on the upper
handle bars, release the strut from the locking tabs
by pulling on the cable connecting the two locking
pins (fig. 3-17).
4. Push up first on the upper handle bars, then on the
lower handle bars while another person receives the
outrigger and pulls it downward until the gas spring
assembly is fully extended (fig. 3-18). DO NOT
stand under the outrigger when performing this
operation.
5. Pull downward on the outrigger until the machine
comes to rest in the full upright position. The Tilt
Back Frame should be raised off of the ground at
this point.
Figure 3-18: Extending the Gas Springs
UL-25/32/40/48 Portable Personnel Lifts
Operation
6. While another person supports the Tilt Back Frame,
release the hair - pin retainer and pull out the
retaining pin. Raise the Tilt Back Frame to its
stowed position and replace the retaining pin and
hair - pin retainer (fig. 3-19). Check to make sure
that the Tilt Back Frame and gas spring assembly are
securely locked in place.
Strut
7. Pull the locking pin on the lifting pocket upward
and remove the outrigger from the front of the
machine. Return it to its storage pocket.
Locking Tabs
Figure 3-19: Stowing the Tilt Back Frame
Section
3.5
3-11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ulii-32Ulii-40Ulii-48

Table of Contents