Stryker GOBED+ FL20E Maintenance Manual

Stryker GOBED+ FL20E Maintenance Manual

Electric acute care bed
Table of Contents

Advertisement

Quick Links

TECHNICAL ASSISTANCE AND PARTS
1 800 428-5025 (Canada)
E-mail (Canada only):
service@bertec.strykercorp.com
1 800 327-0770 (United States)
Manufactured by Stryker Bertec Medical Inc
72-0440 R1.2
F15-44-E-A
MAINTENANCE MANUAL
ELECTRIC ACUTE CARE BED
Model FL20E (USA: 2501)
September 2003
Printed in Canada

Advertisement

Table of Contents
loading

Summary of Contents for Stryker GOBED+ FL20E

  • Page 1 MAINTENANCE MANUAL ELECTRIC ACUTE CARE BED Model FL20E (USA: 2501) TECHNICAL ASSISTANCE AND PARTS 1 800 428-5025 (Canada) E-mail (Canada only): service@bertec.strykercorp.com 1 800 327-0770 (United States) Manufactured by Stryker Bertec Medical Inc 72-0440 R1.2 September 2003 F15-44-E-A Printed in Canada...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS 1. INTRODUCTION........................5 1.1 Specifications ......................... 5 1.2 Technical Support......................6 1.3 Warning, Caution, Note Definition................... 6 1.4 Static Discharge Precautions..................6 1.5 Warranty......................... 7 Limited Warranty ......................7 To Obtain Service and/or Parts ..................7 Return Authorization ....................8 Damaged Merchandise ....................
  • Page 4 4.6 Scale System Calibration ....................41 Verifying Scale Accuracy ....................41 Scale Calibration ......................41 4.7 Load Cell Verification ....................42 4.8 Load Cell Replacement....................43 4.9 Mattress Support Section Replacement ................ 44 Foot Section ........................ 44 Thigh Section ....................... 45 Seat Section ........................
  • Page 5: Introduction

    220V∼, 50-60Hz, 2.9A -Two 250V, 6.3A Slow Blow Fuses 240V∼, 50-60Hz, 2.7A -Two 250V, 6.3A Slow Blow Fuses * Stryker Bertec pays special attention to product improvement and reserves the right to change specifications without notice. **Operating environment recommended to ensure the scale precision.
  • Page 6: Technical Support

    1.2 TECHNICAL SUPPORT For questions regarding this product, contact the following Technical Service department or your local representative: In Canada: In the United States: Stryker Bertec Medical Inc Stryker Medical 1 800 428-5025 1 800 327-0770 E-mail (Canada only): service@bertec.strykercorp.com...
  • Page 7: Warranty

    Introduction Chapter 1 1.5 WARRANTY LIMITED WARRANTY All Stryker Bertec products are guaranteed against material or manufacturing defects, improper operation of mechanisms, and premature wear of bed components under normal use conditions. For questions regarding warranty, please contact Stryker Bertec Technical Service department (see section 1.2) or your local representative.
  • Page 8: Return Authorization

    Stryker Bertec will take back wrong parts ordered but will not assume shipping charges, and restocking fees will be charged to the user unless a Technical Service Representative has been requested for an on-site diagnosis of the malfunction.
  • Page 9: Preventative Maintenance

    Preventative Maintenance Chapter 2 2. PREVENTATIVE MAINTENANCE 2.1 BED CLEANING AND MATTRESS CARE Always unplug the bed power cord from the wall outlet when cleaning or servicing the bed. Do not use harsh cleaners, solvents or detergents. Equipment damage could occur. Do not steam clean, hose off or ultrasonically clean the bed.
  • Page 10: Lubrication Requirements

    GOBED Maintenance Manual 2.2 LUBRICATION REQUIREMENTS Listed below are the lubrication points and their recommended time interval check. When needed, lubricate these points with OG2 grease (P/N M0027). The use of type of grease other than the one recommended (OG2 grease) could lead to deterioration of critical parts and to mechanism failure, resulting in injury to the patient and/or user and damage to the bed.
  • Page 11: Lubrication Points Illustrated

    Preventative Maintenance Chapter 2 LUBRICATION POINTS ILLUSTRATED LEGEND: 1 YEAR 2 YEARS 5 YEARS Figure 2.2B Figure 2.2A Figure 2.2D Figure 2.2E Figure 2.2C Figure 2.2...
  • Page 12: Preventative Maintenance Program

    GOBED Maintenance Manual 2.3 PREVENTATIVE MAINTENANCE PROGRAM When servicing use only identical replacement parts provided by Stryker Bertec. ANNUAL CHECKLIST ____ All fasteners secure. ____ Inspect for excessive wear the oil-impregnated bronze shoulder spacers found at the bed hinge points. Replace as needed. Do not lubricate these spacers.
  • Page 13: Recommended Spare Parts

    Preventative Maintenance Chapter 2 RECOMMENDED SPARE PARTS The following is a list of recommended on hand spare parts for the Part Number Parts Lists ELECTRONIC/ELECTRICAL ASSEMBLY PARTS S. A. Motor control board 80-4029 OL200016 Optional scale control board, English language QDF20-0117 OL200016 Optional display control board...
  • Page 14 GOBED Maintenance Manual Backlit Siderail Control Membrane w/Nurse Call S. A. Left rail membrane 80-4023 OL200075 S. A. Right rail membrane 80-4024 OL200075 SIDERAIL ASSEMBLY PARTS Space Reducer QP20-0036-07 OL200068 S. A. Right release lever 90-1114 OL200067-68 S. A. Left release lever 90-1113 OL200067-68 Shaft plug...
  • Page 15: Troubleshooting

    Troubleshooting Chapter 3 3. TROUBLESHOOTING Please consult the following troubleshooting checklist before calling the Technical Service department (see section 1.2). 3.1 TROUBLESHOOTING GUIDE Definition: DMM = Digital Multi-Meter PROBLEM/FAILURE WHAT TO CHECK No power to bed A. Is the bed power switch turned on? B.
  • Page 16 GOBED Maintenance Manual A. Is the Fowler lockout control activated in No Fowler up or down motion when: the foot board control panel? Deactivate it. - the foot board command is used B. Is the cable of the siderail control panel - the siderail command is used properly connected to the bed connector under the mattress support?
  • Page 17 Troubleshooting Chapter 3 D. Check voltage at the motor control connector mounted on the bed frame (see page 25) E. Run the conductivity test at the motor control connector mounted on the foot board (see page 24) F. Check points F to H of the “No power to bed”...
  • Page 18 GOBED Maintenance Manual K. Scale user interface cable not properly connected or completely disconnected from the scale control board (see figure 4.4A, page 38 for the illustration of the cable connecting position). L. Check 5Vdc at J2 of the scale display interface board 20-0119 (see page 21).
  • Page 19 Troubleshooting Chapter 3 20-0180 - Motor Control Board Connector Voltage Positive Negative Description Location Lead Lead 120 Vac Pin 1 Pin 2 120 Vac Pin 1 Pin 2 12 Vdc Pin 1 Heat Sink 5 Vdc Pin 3 Heat Sink J2 and J5 5 Vdc J5 pin 17...
  • Page 20 GOBED Maintenance Manual 20-0117 or 20-0221 - Scale Control Board Connector Voltage Positive Negative Description Location Lead Lead 12 Vdc Pin 1 Heat Sink 5 Vdc Pin 3 Heat Sink 120 Vac Pin 1 Pin 2 0 ohm Pin 2 Pin 1 Bed Exit OFF Inf ohm...
  • Page 21 Troubleshooting Chapter 3 20-0119 - Scale Display Interface Board Connector Voltage Positive Negative Description Location Lead Lead 5 Vdc Pin 5 or 9 Pin 2 or 7...
  • Page 22 GOBED Maintenance Manual Conductivity Test on the Siderail Cable Plug Connector Ohms Positive Negative Description Location Lead Lead Siderail 0 Ohm Pin 3 Pin 8 Head up activated Cable Plug Siderail 0 Ohm Pin 1 Pin 8 Head down activated Cable Plug Siderail 0 Ohm...
  • Page 23 Troubleshooting Chapter 3 Voltage Test on the Bed Siderail Cable Receptacle ( located on the frame under the seat section of the mattress support Connector Location Voltage Positive Negative Description Lead Lead Bed Siderail 2.5 to 5 V Pin 3 Pin 8 Cable Receptacle Bed Siderail...
  • Page 24 GOBED Maintenance Manual Conductivity Test on the Foot Board Connectors Scale Control Board Motor Control Board Connector Connector Pin 1 Black wire View facing foot end of the bed Connector Ohms Positive Negative Description Location Lead Lead Connector 0 ohm Pin 2 Pin 1 Head up activated.
  • Page 25 Troubleshooting Chapter 3 Voltage Test on the Bed Connectors Scale Control Board Pin 1 Motor Control Board Connector Black wire Connector View facing foot end of the bed Connector Location Voltage Positive Negative Description Lead lead Connector C 2.5 to 5 Volt Pin 2 Pin 1 Connector C...
  • Page 26 GOBED Maintenance Manual Nurse Call Board (20-0121 or 20-0126) 37 Pin Connector Item Part No. Part Name Qty. 3001-303-160 BCT Unit 3001-303-825 37 pin cable 3001-303-162 Instructions 3001-303-871 9V Battery 1. Connect the optional pillow speaker pendant cable to the GEN lll receptacle (nurse call board 20-0121).
  • Page 27 Troubleshooting Chapter 3 Nurse Call Test: Mode NO· 1. The Nurse Call LED turns on when the Nurse Call button is pressed either on the pillow speaker pendant and/or on the bed siderails. Mode NC 1. The Nurse Call LED turns off when the Nurse Call button is pressed either on the pillow speaker pendant and/or on the bed siderails.
  • Page 28 GOBED Maintenance Manual Nurse Call Board 20-0121 or 20-0126 37 Pin Connector Nurse Call Board 20-0126 only Pin 1 Option 2 Common Pin 1 TV, Room light, Reading light Pin 2 Read light common Pin 3 Room light Pin 2 Audio –...
  • Page 29: Maintenance Procedures

    Maintenance Procedures Chapter 4 4. MAINTENANCE PROCEDURES Only field technicians from Stryker or service personnel trained by Stryker should perform the procedures detailed in this maintenance guide, especially those related to the Scale and Bed Exit systems. Failure to observe this restriction can result in serious damage to material and/or severe injury to people.
  • Page 30: Foot Siderail Assembly (Attached To Foot Section)

    GOBED Maintenance Manual FOOT SIDERAIL ASSEMBLY (Attached to Foot Section) Figure 4.1B Required Tools: 5/32" Allen Key Replacement procedure: 1. Run the bed fully up and apply the brakes. Lower the foot siderail needing repair. 2. Run the Knee Gatch fully up and unplug the power cord from the wall receptacle. 3.
  • Page 31: Head Siderail Assembly

    Maintenance Procedures Chapter 4 HEAD SIDERAIL ASSEMBLY Required Tools: 5/32" Allen Key Cutters Replacement Procedure: 1. Run the bed and the Fowler fully up and apply the brakes. 2. Raise the head siderail needing repair and unplug the power cord from the wall receptacle.
  • Page 32: Foot Rail

    GOBED Maintenance Manual FOOT RAIL Figure 4.1D Required Tools: Small Screwdriver Hammer Blunt Ended Tool OG2 Grease (P/N M0027) Replacement Procedure: Run the bed fully up and apply the brakes. Raise the foot siderail needing a rail replacement. Unplug the power cord from the wall receptacle. Use a small screwdriver to remove the plastic shaft plug (A) sealing the front part of the two rail shafts.
  • Page 33: Foot Board Control Panel Component Replacement

    Maintenance Procedures Chapter 4 4.2 FOOT BOARD CONTROL PANEL COMPONENT REPLACEMENT Figure 4.2 Unless otherwise stated, all reference points contained in section 4.2 procedures will refer to figure 4.2 above. CONTROL PANEL MEMBRANE A foot board control panel membrane ordered as a replacement part will be shipped with its support, already affixed to it.
  • Page 34: Scale Display (Optional Equipment)

    GOBED Maintenance Manual SCALE DISPLAY (Optional Equipment) Required Tools: Phillips Screwdriver Replacement Procedure: Run the bed fully up and apply the brakes. Unplug the power cord from the wall receptacle. Remove the head board and lay it on a workbench. Using a Phillips screwdriver, loosen five to six turns the two screws (A) holding in place the membrane support (B).
  • Page 35: Siderail Control Panel Component Replacement

    Maintenance Procedures Chapter 4 4.3 SIDERAIL CONTROL PANEL COMPONENT REPLACEMENT Figure 4.3 Unless otherwise stated, all reference points contained in section 4.3 procedures will refer to figure 4.3 above. CONTROL PANEL MEMBRANE Different siderail membranes may equip a . Our Technical Service representative (see section 1.2) will help you order the correct membranes.
  • Page 36: Optional Nurse Call Speakerphone

    GOBED Maintenance Manual OPTIONAL NURSE CALL SPEAKERPHONE The membrane affixed to the nurse call speakerphone panel will have to be replaced. It must be ordered along with the replacement speakerphone. Required Tools: Phillips Screwdriver Soldering Iron and Welding Wire Replacement Procedure: Run the bed fully up and apply the brakes.
  • Page 37: Control Board Replacement

    Maintenance Procedures Chapter 4 4.4 CONTROL BOARD REPLACEMENT MOTOR CONTROL BOARD FOOT END CASING COVER Figure 4.4 Required Tools: Phillips Screwdriver 3/8" Wrench Needle Nose Pliers Replacement Procedure: 1. Run the bed fully up and apply the brakes. Unplug the power cord from the wall receptacle and remove the foot panel.
  • Page 38: Scale Control Board (Optional)

    GOBED Maintenance Manual SCALE CONTROL BOARD (OPTIONAL) HEAD END HEAD RIGHT SCALE USER FOOT LEFT FOOT RIGHT HEAD LEFT INTERFACE LOAD CELL LOAD CELL LOAD CELL LOAD CELL CABLE Figure 4.4A When ordering, be sure to mention the PC Board software language. Required Tools: Phillips Screwdriver 3/8"...
  • Page 39: Nurse Call Control Board (Optional)

    Maintenance Procedures Chapter 4 • Insert two new stand off pins through the holes under the housing bottom and the PC Board. Pull up the protruding end of the pins to ensure that their retaining clips are completely inserted through the housing bottom and the PC Board. 10.
  • Page 40: Power Connector Fuse Replacement

    GOBED Maintenance Manual 4.5 POWER CONNECTOR FUSE REPLACEMENT Figure 4.5 Required Tools: Small Slotted Screwdriver Replacement Procedure: 1. Using a small slotted screwdriver, open and slide down the power connector door (A). 2. Still using the small screwdriver, remove the fuse holder (B). 3.
  • Page 41: Scale System Calibration

    Maintenance Procedures Chapter 4 4.6 SCALE SYSTEM CALIBRATION VERIFYING SCALE ACCURACY: 1. Zero the empty bed (refer to section 2.16 of the Operations manual, “Operating (Zeroing) the Scale Before Putting New Patient in the Bed”). 2. Place a known weight on the centre of the bed. The displayed weight should be within ±2 % if weight is equal or over 100 lb or ±...
  • Page 42: Load Cell Verification

    GOBED Maintenance Manual 4.7 LOAD CELL VERIFICATION It requires two people to activate the Cell Verification mode. 1. Bring the mattress support to the horizontal position. 2. To enter the Cell Verification mode, unplug the power cord from the wall receptacle. 3.
  • Page 43: Load Cell Replacement

    Maintenance Procedures Chapter 4 4.8 LOAD CELL REPLACEMENT TÊTE HEAD END Figure 4.8 Required Tools: Jack Stands (2) Needle Nose Pliers 5/16" Allen Key 1/2" Wrench Replacement Procedure: 1. Run the bed fully up and apply the brakes. 2. Remove the head or foot board and place jack stands under the head or foot end of the bed (see figure 4.13A, Appendix F) depending on the load cell to be replaced.
  • Page 44: Mattress Support Section Replacement

    GOBED Maintenance Manual 4.9 MATTRESS SUPPORT SECTION REPLACEMENT FOOT SECTION Figure 4.9A Required Tools: 7/16" Wrench 1/2" Wrench Phillips Screwdriver Replacement Procedure: 1. Run the bed fully up and apply the brakes. 2. Lower the head siderails and raise the foot siderails. 3.
  • Page 45: Thigh Section

    Maintenance Procedures Chapter 4 THIGH SECTION Figure 4.9B Required Tools: Needle Nose Pliers 1/2" Wrench Phillips Screwdriver Replacement Procedure: 1. Run the bed fully up, apply the brakes and bring the sleep surface to horizontal position. 2. Unplug the power cord from the wall receptacle. 3.
  • Page 46: Seat Section

    GOBED Maintenance Manual SEAT SECTION Figure 4.9C Required Tools: 1/2" Wrench 1/2" Socket and Ratchet Replacement Procedure: 1. Run the bed fully up, apply the brakes and bring the sleep surface to horizontal position. 2. Unplug the power cord from the wall receptacle. 3.
  • Page 47: Head Section

    Maintenance Procedures Chapter 4 HEAD SECTION Figure 4.9D Required Tools: 1/2" Wrench Phillips Screwdriver Tie-Down Ratchet Strap 7/16" Wrench Needle Nose Pliers Replacement Procedure: 1. Run the bed fully up, apply the brakes and bring the sleep surface to horizontal position. 2.
  • Page 48 GOBED Maintenance Manual Figure 4.9E 10. Using a 1/2" wrench, remove the locknut/bolt (E) holding the upper part of the compression bar to the head section and lay it down. 11. Using a 1/2" wrench, remove the locknut/flat washers(2)/bolt (F) linking the lower part of the compression bar to the head section and remove the compression bar.
  • Page 49 Maintenance Procedures Chapter 4 Figure 4.9F 16. Using a 7/16" wrench, remove two locknuts/bolts (E) holding both release handles to the head section. 17. Remove the pressure cable clip (F) from the head section. 18. Disconnect the two wires (G) from the micro switch. Note the wire connecting positions. 19.
  • Page 50: Actuator Replacement

    GOBED Maintenance Manual 4.10 ACTUATOR REPLACEMENT ’ VÉRINS D ÉLÉVATION LO ACTUATORS VÉRIN DE CUISSE THIGH ACTUATOR VERIN DE TETE HEAD ACTUATOR Figure 4.10 Unless otherwise stated, all reference points contained in section 4.10 procedures will refer to figure 4.10 above.
  • Page 51: Thigh Actuator

    Maintenance Procedures Chapter 4 THIGH ACTUATOR Required Tools: Needle Nose Pliers Phillips Screwdriver 3/4" wrench OG2 Grease Replacement Procedure: 1. Run the bed fully up, apply the brakes and flatten the sleep surface. 2. Lower the head siderails and raise the foot siderails. 3.
  • Page 52: Head Actuator

    GOBED Maintenance Manual HEAD ACTUATOR Required Tools: Phillips Screwdriver 3/4" Wrench OG2 Grease Needle Nose Pliers Replacement Procedure: 1. Run the bed fully up, apply the brakes and flatten the sleep surface. 2. Run the Knee Gatch fully up and unplug the power cord from the wall receptacle. 3.
  • Page 53: Hi-Lo Actuator

    Maintenance Procedures Chapter 4 HI-LO ACTUATOR In order to preserve the adjustment of the bed lowest position when replacing a Hi-lo actuator, a special tool kit designed for that purpose must be used. To obtain this kit, contact our Service department (see section 1.2) and order part number KR0090.
  • Page 54: Actuator Screw Lubrication Procedure

    GOBED Maintenance Manual 4.11 ACTUATOR SCREW LUBRICATION PROCEDURE All reference points contained in this procedure will refer to fig. 4.10 on page 50. Required Tools: Slotted Screwdriver 5/16" Wrench Bungee Cords OG2 Grease and Brush Lubrication Procedure for the Head and Knee Actuator Screws: 1.
  • Page 55: 5Th Steer Wheel Component Replacement

    Maintenance Procedures Chapter 4 4.12 5th STEER WHEEL COMPONENT REPLACEMENT SWING ARM ASSEMBLY Figure 4.12 Unless otherwise stated, all reference points contained in section 4.12 procedures will refer to figure 4.12 above. ACTIVATION LEVER (D, fig. 4.12) Required Tools: Phillips Screwdriver 1/8"...
  • Page 56: Swing Arm Assembly

    GOBED Maintenance Manual Before replacing the set screws, apply medium strength thread locker (blue) on the screw threads. 6. Using a 1/8" Allen key, remove the set screws (E) located on the head and foot locking levers (F). Before replacing the set screws, apply medium strength thread locker (blue) on the screw threads.
  • Page 57 Maintenance Procedures Chapter 4 8. Using a 1/2" wrench, remove the locknut/bolt (L) holding both steer wheel mechanism supports (M) to the retaining plates (N). When reassembling, tighten definitely the bolts/locknuts (L) holding the supports to the retaining plates only after the pedal shafts are inserted into the lever sockets. Do not tighten too tight, the supports could buckle.
  • Page 58: Caster Replacement

    GOBED Maintenance Manual 4.13 CASTER REPLACEMENT Figure 4.13 Required Tools: Jack Stands (2) Phillips Screwdriver 1/2" wrench 7/16" wrench 1/8" Allen key Replacement Procedure: 1. Raise the bed enough to place under the frame at the head or foot end of the bed (depending on the caster to be changed) two jack stands adjusted to 20"...
  • Page 59 Maintenance Procedures Chapter 4 10. Remove the Rue ring (F) at the inner end of the locking axle (G). 11. Using a 1/8" Allen key, remove the set screw (H) located on the locking lever (J) (for ease of access to the set screw, depress the steer/brake pedal on the side opposite to the caster needing replacement) and remove the locking lever from the locking axle (G).
  • Page 60: Hi-Lo Lever Replacement

    GOBED Maintenance Manual 4.14 HI-LO LEVER REPLACEMENT HEAD TÊTE Figure 4.14 Required Tools: Jack Stands (2) Long Nose Pliers Phillips Screwdriver Two 1/2" Wrenches Replacement Procedure: 1. Run the bed fully up and apply the brakes. 2. Adjust the mattress support depending on the Hi-Lo lever to be replaced: Hi-Lo lever located at the head end of the bed Run Fowler fully up.
  • Page 61 Maintenance Procedures Chapter 4 7. If you are replacing the Hi-Lo lever located at the foot end of the bed, use a Phillips screwdriver to remove the two machine screws (B) holding the upper part of the right and left stabilizers (C) to the Hi-Lo lever (D). Before replacing the machine screws, apply medium strength thread locker (blue) on the screw threads.
  • Page 62: Optional Cpr Release Component Replacement

    GOBED Maintenance Manual 4.15 OPTIONAL CPR RELEASE COMPONENT REPLACEMENT Figure 4.15 Unless otherwise stated, all reference points contained in section 4.15 procedures will refer to figure 4.15 above. CPR RELEASE CABLE Required Tools: Bungee Cords 7/16" Wrench Side Cutters Replacement Procedure: 1.
  • Page 63: Cpr Pneumatic Cylinder

    Maintenance Procedures Chapter 4 The CPR release cables must be adjusted for the CPR mechanism to operate properly. 9. Tighten the cable nuts at the handle end first, then at the fixed lever (D) end making sure that there is a slight play in the CPR handle and that the Fowler drops at the slightest activation of the CPR handle and stops when the handle is released.
  • Page 64: Appendix A: Motor Connection Diagram

    Appendix A: Motor Connection Diagram Appendix A: Motor Connection Diagram QE71-0554 Lit modèle MODULE DE COMMANDE MODULE DE COMMANDE Bed model FL20E-_ _ _ _ DU CÔTÉ DE LIT/ DU CÔTÉ DE LIT/ SIDERAIL CONTROL PANEL SIDERAIL CONTROL PANEL SCHÉMA DE BRANCHEMENT DES MOTEURS MOTOR CONNECTION DIAGRAM TRANSFORMATEUR / TRANSFORMER...
  • Page 65: Appendix B: Scale Connection Diagram

    Appendix B: Scale Connection Diagram Appendix B: Scale Connection Diagram PANNEAU DE PIED/ FOOT BOARD CONTACTS/ PINS CELLULE DE CHARGE PIED - DROIT/ LOAD CELL FOOT-RIGHT CELLULE DE CHARGE PIED - GAUCHE/ LOAD CELL FOOT - LEFT CELLULE DE CHARGE CHÂSSIS/ PIED - DROIT/ FRAME...
  • Page 66: Appendix C: Nurse Call Connection Diagram

    Appendix C: Nurse Call Connection Diagram Appendix C: Nurse Call Connection Diagram QE71-0555-T SCHÉMA DE BRANCHEMENT CONNECTION DIAGRAM CLOCHE D'APPEL NURSE CALL Qté BORNE DE CONNEXION (6x2) / CONNECTION TERMINAL (6X2) CIRCUIT ÉLECTRONIQUE CLOCHE D'APPEL / NURSE CALL CONTROL BOARD MICROPHONES - HAUT PARLEURS / SPEAKERPHONES BOUTON CLOCHE D'APPEL / NURSE CALL BUTTON...
  • Page 67: Appendix D: Toroidal Transformer Connection Diagram (Fl20E International Series)

    Appendix D: Toroid Transformer Connection Diagram Appendix D: Toroidal Transformer Connection Diagram (FL20E International Series) QE71-0559-T SCHÉMA DE BRANCHEMENT CONNECTION DIAGRAM TRANSFORMATEUR TRANSFORMER Noir/Black Rouge/ Jaune/Yellow Orange/Orange 120V Brun/Brown Bleu/Blue Rouge/ Blanc/White Noir/Black Qté Transformateur/Transformer Fusible/Fuse (200-220-240V, 6.3A)(100V, 10A) Connecteur d'alimentation/Power connector Fil d'alimentation/Power cable Cavalier/Jumper(200-220-240V) Connecteur mâle/Pin connector...
  • Page 68: Appendix E: Toroidal Transformer Replacement (Fl20E International Series)

    Appendix E: Toroidal Transformer Replacement Procedure Appendix E: Toroidal Transformer Replacement (FL20E International Series) Required Tools: Phillips Screwdriver Cutting Pliers 1/2" Wrench Nylon Cable Ties (2) Replacement Procedure: Run the bed fully up and apply the brakes. Raise the head section fully up. Unplug the power cord from the wall receptacle, remove it from the bed connector and remove the head board.
  • Page 69: Appendix F: Bed Positions For Maintenance Purpose

    Appendix F: Bed Positions for Maintenance Purpose Appendix F: Bed Positions for Maintenance Purpose Figure 4.1 KNEE GATCH AND FOOT SECTION FOLDED BACK TOWARD HEAD END OF THE BED Figure 4.10A BLACK BEARINGS JIGS ALIGNMENT JIGS POSITIONED UNDER THE FOUR BLACK BEARINGS FOR A HI LO ACTUATOR REPLACEMENT JACK STANDS POSITIONED UNDER THE FOOT END OF THE BED...

Table of Contents