Playcraft Revolution Post Top Cap Installation Instructions

Advertisement

REVOLUTION POST TOP CAP
INSTALLATION INSTRUCTIONS

IMPORTANT NOTES: Read First

(A) Use liquid thread lock (such as Loctite
curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
®
) with all threaded hardware. Important: Liquid thread lock (prior to
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
RV-21000
FIGURE 1
Revolution Post Top Cap
NOTE: Revolution Post Top Cap shown.
Other configurations will vary slightly, but
does not affect assembly.
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Page 1 of 2
Rev A
4/1/2011

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Revolution Post Top Cap and is the answer not in the manual?

Questions and answers

Summary of Contents for Playcraft Revolution Post Top Cap

  • Page 1 "thread seizure" in stainless steel hardware by serving as a lubricant during assembly. FIGURE 1 Revolution Post Top Cap NOTE: Revolution Post Top Cap shown. Other configurations will vary slightly, but does not affect assembly. For Customer Service Call Rev A Manufactured by Krauss Craft, Inc.
  • Page 2 Part # DESCRIPTION Shall be precision die-cast from a high-strength GH-0002 Revolution Post Top Cap aluminum alloy. The Revolution Post Top Cap shall 9271062-TR Screw Tek 1/4" x 1-1/4" BH TR have a multi-stage baked-on powder coat finish. HARDWARE: Shall be stainless steel, zinc/nickel plated or galvanized as required to resist rust and corrosion.

This manual is also suitable for:

Rv-21000

Table of Contents