Converter test kit OPTIMUS for OPTIMUS 50/65/80 gen‐
erators release 3.x with converters 4512 104 7231x
7

INTERIM RESULTS

At this point
– generator parts and units
– tube(s)
– HV cables
have been checked.
Something might have been exchanged or all tests came to an OK-result.
▪ Remove the extender PCB and reinsert kV-control EZ130.
WARNING
▪ Switch ON all generator breakers and the mains supply.
Conv test Optimus
All followings checks must be made with mains power.
Check that the converter mains lines still have no connection
to mains at ENK1 :1, :3, :5
CSIP Level 1 (08.0)
© 2008 Koninklijke Philips Electronics N.V.