9.1 Requirements in line with ap-
proval
9.1.1 Approval provisions
Approval provision ER-APB
Number of units per
floor, residential unit
or fire zone
Shaft wall
Connection ducts in-
side the shaft
Connection ducts
outside the shaft
Duct elbows in the
unit connection duct
Number of duct el-
bows permitted for
wall installation
Number of duct el-
bows permitted for
ceiling installation
Regulating equip-
ment in the exhaust
air duct
Wall/ceiling opening
for DN 80 unit con-
nection duct
ER-AP
Max. 3
Max. 2 fans
fans or 3
or 2 connec-
connec-
tions
tions
min. 35
min. 35 mm ,
mm , board
board mater-
materials
ial, any
(F90)
AFR 80 flexible alu-
minium duct between the
main duct in the shaft and
unit, max. 2 m long (→ ap-
proval).
Steel fol-
Steel folded
ded spiral-
spiral-seams
seams
duct or flex-
duct,
ible alu-
between
minium duct,
the main
between the
duct in the
main duct in
shaft and
the shaft and
the unit,
the unit, max.
max. 2 m
2 m long (→
long (→
approval).
approval).
Max. 90° bend,
ascending
Max. 1 x
Max. 2 x 90°
90°
Max. 2 x
Max. 3 x 90°
90°
Not permitted
Brickwork or concrete:
130 mm.
Board materials (F90):
Outer Ø of pipe
9.2 Permitted installation positions:
Wall installation, top left corner of room
Wall installation, top right corner of room
Ceiling installation
9 Mounting preparations
11