Switch Chassis; General Installation Guidelines - Edge-Core ECS4510-12PD Installation Manual

12-port layer 2 gigabit ethernet switch
Hide thumbs Also See for ECS4510-12PD:
Table of Contents

Advertisement

3

General Installation Guidelines

Switch Chassis

The switch is designed to be installed in a standard 19-inch equipment rack.
Before continuing with switch installation, first review the general guidelines and
switch cooling requirements in this chapter.
This chapter includes these sections:
"General Installation Guidelines" on page 21
"How to Install the Switch in a Rack" on page 22
"How to Install the Switch on a Shelf or Desktop. " on page 25
"Switch Cooling Requirements" on page 26
Be sure to follow the guidelines below when choosing a location.
The installation location should:
be able to maintain its temperature within 0 to 50 ° C (32 to 122 ° F) and its
humidity within 10% to 90%, non-condensing.
provide adequate space (approximately five centimeters or two inches) on all
sides for proper airflow.
be accessible for installing, cabling and maintaining the device.
allow the status LEDs to be clearly visible.
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference, such as
radios and transmitters.
Make sure that the unit is connected to a separate grounded power outlet and
is powered from an independent circuit breaker. As with any equipment, using
a filter or surge suppressor is recommended. Verify that the external AC power
requirements for the switch can be met as listed under
Specifications" on page
27.
– 21 –
"DC Power Supply

Advertisement

Table of Contents
loading

Table of Contents