MAINTENANCE

General Clean Up

Note: Follow proper Lockout / Tagout procedures prior to cleaning or performing
maintenance on any part of the machine.
On a daily basis use an air-hose to blow-off the dust and wood chips that accumulate in,
on and around the machine.
The machine operator or clean-up person is closer to dangerous operating mechanisms
of the machine during clean up than during production – extra care should be taken
during this time.
Do NOT clean with flammable or combustible materials.
Follow applicable codes and standards with regards to:
 Ventilation and monitoring of work area for excessive accumulation of hazardous
vapors
 Wearing personal protective equipment for handling materials
Using proper procedure for disposing of all waste materials

Inspection and Preventative Maintenance Checklist

Frequency
 Complete a visual inspection of the machine before the beginning of each
Daily
(Approx. 8 hrs)
 Check the conveyor belt for cracks and ensure tension is "taut" with no more than
Weekly
(Approx. 40 hrs)
 Check the material transportation chains and ensure tension is "taut" with no more
Weekly
 Grease the material pusher linear rail bearings. We recommend JT-6 grease (no
Weekly
 Grease bearings using high temperature grease. We recommend JT-6 grease (no
Every 3 Months
(Approx 480 hrs)
production day and look for loose, worn, broken or defective parts.
1/2" of deflection in the belt.
than a 1/2" of play in the tension of the chains.
more than 3 pumps).
more than 5 pumps).
Baker M6 DeDuster - Rev 1,
Recommendation
11/07;
WWW.BAKER-ONLINE.COM
19
Important Notice:
Improper lubrication
will void warranty.