WEEKLY - Check conveyor band belt and ensure tension is "taut" with no more than 1/2"
of deflection in the belt. (Figure 20 & 20A)
Belt tension should
be "taut" with no more
than ½" of deflection
Figure 20A
WEEKLY - Check the material transportation chains and ensure tension is "taut" with no
more than a 1/2" of play in the tension of the chains. (Figure 20B & 20C)
Figure 20B
Increase or decrease chain
(1) chain per side, (2) total
Increase or decrease
Increase or decrease
tension here
Baker M6 DeDuster - Rev 1,
belt tension here
tension here
Figure 20C
11/07;
WWW.BAKER-ONLINE.COM
20
Figure 20
Increase or decrease chain
Increase or decrease chain
tension here
tension here
(1) chain per side, (2) total
(1) chain per side, (2) total