Replacing Tensioning Device - Sl110 - Kohler KD62V12 Operation And Maintenance Manual

Hide thumbs Also See for KD62V12:
Table of Contents

Advertisement

Maintenance
Daily or monthly maintenance activities
u Pivot back tensioning device 1 against the spring force to the limit stop.
u Insert guiding pin (8 mm/0.315 inch diameter) to block the tensioning device.
u Remove V-ribbed belt 2.
u Remove guiding pin.
u Release and remove ratchet wrench.
w The tensioning device is released.
Install V-ribbed belt
u Install ratchet wrench on tensioning device 1.
u Pivot back the tensioning device against the spring force to the limit stop.
u Insert 8 mm/0.315 inch guiding pin to block the tensioning device.
u Install V-ribbed belt 2.
u Hold ratchet wrench, remove guiding pin.
u Release and remove ratchet wrench.
w The tensioning device is released.
Fig. 53: Checking V-ribbed belt tension — Measurement area (left)
1
Sensor
u Check tension with adequate tool. The measured frequency value must be 165 Hz (Min149 Hz -
Max 182 Hz).
In case of air conditioning compressor installed, proceed in the same way.
Information
Mount the battery charging alternator cover in reverse sequence.
5.6.3 Removal of the battery charging alternator cover, page 95)
5.6.6 Replacing tensioning device — SL110
q The battery charging alternator cover is dismounted.
of the battery charging alternator cover, page 95)
q The V-ribbed belt is removed.
109, page 97)
98
(For more information see: 5.6.5 Replacing V-ribbed belt — SL
.
© 2019 by Kohler Co. All rights reserved.
Operation and Maintenance Manual
2
Belt section
(For more information see:
(For more information see: 5.6.3 Removal
.
KD62V12 33521030301_6_1 EN_US
2019-02

Advertisement

Table of Contents
loading

Table of Contents