Inspection And Tests - HBS Visar 650 Operating Manual

Stud welding unit
Table of Contents

Advertisement

16 Maintenance and Care
16.2

Inspection and Tests

‹ Inspect the condition of the mains cable.
‹ Inform your dealer or maintenance department if you discover any dama-
ge.
‹ Check whether the readings on the display of the stud welding unit are
still legible before starting work.
‹ Clean display and control panel in the event of soiling.
‹ Replace any removed or damaged signs:
52
Before opening machine disconnect mains
Observe the operating manual
Warning of electric shock hazard
©HBS Bolzenschweiss-Systeme GmbH & Co. KG
All rights reserved – Reprinting, in whole or in part, only with the approval of the manufacturer

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

93-60-0650

Table of Contents