Filling Water - Ferroli OMNIA M 3.2 Installation And Owner's Manual

Reversible heat pump units for outdoor installation with dc inverter compressor
Hide thumbs Also See for OMNIA M 3.2:
Table of Contents

Advertisement

Available languages

Available languages

When the unit is not running for a long time, make sure the unit is powered on all the time. If you want to cut off the
power, the water in the system pipe needs to be drained clean, avoid the unit and pipeline system be damaged by
freezing. Also the power of the unit needs to be cut off after water in the system is drained off.
.
Ethylene Glycol and Propylene Glycol are TOXIC

9.5 Filling water

Connect the water supply to the fill valve and open the valve.
Make sure the automatic air purge valve is open (at least 2 turns).
Fill with water pressure of approximately 2.0 bar. Remove air in the circuit as much as possible using the air purge
valves. Air in the water circuit could lead to malfunction of the backup electric heater.
Do not fasten the black plastic
cover on the vent valve at the
topside of the unit when the
system is running. Open air
purge valve, turn anticlockWise
at least 2 full turns to release air
from the system.
During filling, it might not be possible to remove all air in the system. Remaining air will be removed through the
automatic air purge valves during the first operating hours of the system. Topping up the water afterwards might be
required.
The water pressure will vary depending on the water temperature (higher pressure at higher water temperature).
However, at all times water pressure should remain above 0.3 bar to avoid air entering the circuit.
The unit might drain-off too much water through the pressure relief valve.
Water quality should be complied with EN 98/83 EC Directives.
Detailed water quality condition can be found in EN 98/83 EC Directives.
CAUTION
WARNING
NOTE
34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents