Operation; Product Diagram - Veris Industries H81 Series Installation Manual

Hide thumbs Also See for H81 Series:
Table of Contents

Advertisement

oPeration

The H81xx Series energy meter combines industrial-grade split-core current
transformers and precision microprocessor-based metering electronics. It can detect
phase reversal, which eliminates load orientation concerns. The meter and current
transformers are calibrated as a set, so the installer must match their serial numbers
at the time of installation. The H8150 provides a control power voltage range of 90-
132 VAC. The H8163 provides an extended input control power voltage range (90-300
VAC).
The H8163 model also has a pulse output compatible with building control systems,
a phase loss output to protect equipment, and a slot to install a Modbus, BACnet, or
Metasys communication board (sold separately). When equipped with this board
and connected to a data acquisition system, the H8163 can report energy and power
diagnostic variables, including kWh, kW, PF, kVAR, Volts, and Amps.

Product diagram

H81xx Series Cover
Display.
1.
Large digit backlit LCD for data and diagnostics.
Security hasp.
2.
Current transformer input terminals.
3.
current transformer are properly matched (e.g. red to red).
Voltage input terminals.
4.
These ensure that voltage lead and current
transformer are properly matched (e.g. red to red).
Pulse output terminals.
5.
These provide easy integration to existing control/data
acquisition systems. (H8163 only)
Phase loss output alarm.
6.
Alarm trips to protect equipment if phase voltage
drops 25%. (H8163 only)
Pulse rate selection switch.
7.
Set the pulse output at 0.1, 0.25, 0.50, or 1 pulse/
kWh to match resolution requirements. (H8163 only)
kWh reset.
8.
To reset the kWh counter, push both buttons at the same time and
hold for 10 seconds. To reset kW max, push both buttons and hold for 5 seconds.
Backlight enabling jumper.
9.
Remove this jumper to disable lighting.
Plain/full display data jumper.
10.
details).
Z205338-0C
PAGE 5
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
1
2
U L
C
US
®
These ensure that voltage lead and
20 or 90 second display cycle (see page 5 for
©2009 Veris Industries USA 800.354.8556 or +1(0)503.598.4564 / support@veris.com
H81xx
H8163 Inside and Board Layout
8
9
H8150 Inside and Board Layout
8
9
Connect white wire to (-).
Connect red/black/yellow wire to (+).
INSTALLATION GUIDE
Comm Board Slot *
Display
Plain
7
Full
10
Power Supply Board Slot
Black
Black
Red
Yellow
Red
+ - + - + -
N
A
B
3
N
A
B
+ A D + B D
+ C D
* Comm board is optional and sold as a separate product.
Comm Board Slot *
Display
Plain
Full
10
Power
Supply
Black
Black
Red
Yellow
Red
+ - + - + -
N
A
B
3
N
A
B
+ A D + B D
+ C D
* Comm board is optional and sold as a separate product.
5
6
Yellow
C
4
C
Yellow
C
4
C
07091

Advertisement

Table of Contents
loading

Table of Contents