This symbol indicates an electrical shock hazard exists.
Documentation must be consulted where this symbol is used on the
product.
safety
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Only qualified electrical workers should install this equipment. Such work
should be performed only after reading this entire set of instructions.
Before performing visual inspections, tests, or maintenance on this
equipment, disconnect all sources of electric power. Assume that all
circuits are live until they have been completely de-energized, tested,
and tagged. Pay particular attention to the design of the power system.
Consider all sources of power, including the possibility of backfeeding.
Turn off all power supplying the power meter and the equipment in which
it is installed before working on it.
Always use a properly rated voltage sensing device to confirm that all
power is off.
Apply appropriate personal protective equipment (PPE) and follow safe
electrical work practices. In the USA, see NFPA 70E.
Qualified persons performing diagnostics or troubleshooting that require
electrical conductors to be energized must comply with NFPA 70 E -
Standard for Electrical Safety Requirements for Employee Workplaces and
OSHA Standards - 29 CFR Part 1910 Subpart S - Electrical.
Before closing all covers and doors, carefully inspect the work area for
tools and objects that may have been left inside the equipment.
Use caution while removing or installing panels so that they do not
extend into the energized bus; avoid handling the panels, which could
cause personal injury.
NEVER bypass external fusing.
NEVER short the secondary of a potential transformer.
Before performing Dielectric (Hi-Pot) or Megger testing on any
equipment in which the power meter is installed, disconnect all input
and output wires to the power meter. High voltage testing may damage
electronic components contained in the power meter.
The power meter should be installed in a suitable electrical and fire
enclosure.
Failure to follow these instructions may result in death or serious
injury
.
Z205338-0C
PAGE 4
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Veris, and the Veris 'V' logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
©2009 Veris Industries USA 800.354.8556 or +1(0)503.598.4564 / support@veris.com
H81xx
Always observe all National and Local Codes during installation
of this product.
Provide a disconnect device to disconnect the H81xx from the supply source. Place
this device in close proximity to the equipment and within easy reach of the operator,
and mark it as the disconnecting device. The disconnecting device shall meet
the relevant requirements of IEC 60947-I and IEC 60947-3 and be suitable for the
application. In the US and Canada, disconnecting fuse holders can be used.
Provide overcurrent protection devices for supply conductors. Install per national or
local regulations.
If the equipment is used in a manner not specified by the manufacturer, the
protection provided by the device may be impaired.