Page 1
GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 1 of 5 IMPORTANT NOTES: Read First ® (A) Use liquid thread lock (such as Loctite ) with all threaded hardware. Important: Liquid thread lock (prior to curing helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a lubricant during assembly.
Page 2
GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 2 of 5 SIDE ELEVATION SIDE ELEVATION Deck to Ground Mount Deck to Deck Mount 24" 610mm Max. deck height difference 60" 1524mm Max. 24" [610mm] Min. Deck to Finish Grade (Finish Grade)
Page 3
GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 3 of 5 Step 2 (Factory Assembled) Plug vent holes at each end using the Vent Plugs as shown in Figure 1.1. Step 3 GEO-WAVE CLIMBER Attach Half Walls to decks. (See Note C)
Page 4
GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 4 of 5 Step 6 For Deck to Ground Mount Only Attach Geo-Wave Climber Legs to Geo-Wave Climber GEO-WAVE as shown in Figure 1.3. Place Geo-Wave Climber CLIMBER Legs into footing holes. (See Notes A & B) 1/2"...
Page 5
GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 5 of 5 Parts List Specifications GEO-WAVE CLIMBER: DECK TO DECK MOUNT Shall be constructed of UV-stabilized, rotationally Part # DESCRIPTION molded, linear low density polyethylene with an average double wall thickness of .250".
Need help?
Do you have a question about the 1249-DDH and is the answer not in the manual?
Questions and answers