GEO-WAVE CLIMBER HORIZONTAL
INSTALLATION INSTRUCTIONS

IMPORTANT NOTES: Read First

(A) Use liquid thread lock (such as Loctite
curing helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B) Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be
allowed to cure completely before using the equipment (at least 72 hours).
(C) Refer to Installation Manual for 1309 Half Wall assembly instructions.
(D) Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication -
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate
for the fall height of the equipment or consult your surfacing supply representative.
See Installation Manual
Section 1309 Half Wall
See Footing Detail
®
) with all threaded hardware. Important: Liquid thread lock (prior to
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
Geo-Wave Climber Horizontal
Deck to Ground Mount
Figures 1.2 & 1.4
Figures 1.1 and 1.3
NOTE: R5 4' deck height ground mount shown.
Other configurations will vary slightly but does
not affect assembly.
1249-DDH/DGH
Page 1 of 5
FIGURE 1
Rev D
10/7/2020

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 1249-DDH and is the answer not in the manual?

Questions and answers

Summary of Contents for Playcraft 1249-DDH

  • Page 1 GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 1 of 5 IMPORTANT NOTES: Read First ® (A) Use liquid thread lock (such as Loctite ) with all threaded hardware. Important: Liquid thread lock (prior to curing helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a lubricant during assembly.
  • Page 2 GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 2 of 5 SIDE ELEVATION SIDE ELEVATION Deck to Ground Mount Deck to Deck Mount 24" 610mm Max. deck height difference 60" 1524mm Max. 24" [610mm] Min. Deck to Finish Grade (Finish Grade)
  • Page 3 GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 3 of 5 Step 2 (Factory Assembled) Plug vent holes at each end using the Vent Plugs as shown in Figure 1.1. Step 3 GEO-WAVE CLIMBER Attach Half Walls to decks. (See Note C)
  • Page 4 GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 4 of 5 Step 6 For Deck to Ground Mount Only Attach Geo-Wave Climber Legs to Geo-Wave Climber GEO-WAVE as shown in Figure 1.3. Place Geo-Wave Climber CLIMBER Legs into footing holes. (See Notes A & B) 1/2"...
  • Page 5 GEO-WAVE CLIMBER HORIZONTAL 1249-DDH/DGH INSTALLATION INSTRUCTIONS Page 5 of 5 Parts List Specifications GEO-WAVE CLIMBER: DECK TO DECK MOUNT Shall be constructed of UV-stabilized, rotationally Part # DESCRIPTION molded, linear low density polyethylene with an average double wall thickness of .250".

This manual is also suitable for:

1249-dgh

Table of Contents