Download Print this page

Flashforge THOR500T Quick Start Manual page 5

Advertisement

7. Take the build plate base out of the carton.
(Two-person operation is recommended)
9. Check parts of the tool box: tool kit, memory
card, screw bag, filament, ribbons, filament
fixed seat, filament support, T-type fixed seat
of Z-axis, T-type fixed seat of Z-axis+Sensor.
11. There are 4 screws of M5*25, 5 screws of M4*6,
4 screws of M4*8 and 8 set screws of M4*5
inside the screw bag.
8. Put build plate on the table and check all the
parts of the printer,no damage.
10. Take out the unclogging pin tool, grease, Allen
wrench, stamping wrench, PTFE tube inside
the tool kit.
Unboxing of profile machine completed.
Suggest to keep packing materials well for
further storage or transportation.
04

Advertisement

loading

This manual is also suitable for:

Thor400tThor300t