SolarEdge Se K Series Installation Manual page 8

Three phase inverter with synergy technology
Hide thumbs Also See for Se K Series:
Table of Contents

Advertisement

WARNING!
Before operating the inverter, ensure that the inverter AC power cable and wall
outlet are grounded properly. This product must be connected to a grounded,
metal, permanent wiring system, or an equipment-grounding conductor must
be run with the circuit conductors and connected to the equipment grounding
terminal or lead on the product.
WARNING!
Opening the inverter and repairing or testing under power must be performed
only by qualified service personnel familiar with this inverter.
WARNING!
Do not touch the PV panels or any rail system connected when the inverter
switch is ON, unless grounded.
WARNING!
SafeDC complies with IEC60947-3 when installing the system with a worst case
SafeDC voltage (under fault conditions) < 120V.
The worst case voltage is defined as: Voc, max+ (String Length-1)*1V, where:
Voc,max = Maximum Voc (at lowest temperature) of the PV modules in the
string (for a string with multiple modules, use the max value)
String Length = number of Power Optimizers in the string
CAUTION!
This unit must be operated according to the technical specification datasheet
provided with the unit.
CAUTION!
HEAVY OBJECT. To avoid muscle strain or back injury, use proper lifting
techniques, and if required - a lifting aid.
NOTE
Use PV modules rated according to IEC 61730 class A.
NOTE
The symbol
symbol is also used in this manual.
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
appears at grounding points on the SolarEdge equipment. This
HANDLING AND SAFETY INSTRUCTIONS
    7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se17kSe20kSe100kSe7kSe10kSe8k ... Show all

Table of Contents