Reporting and Monitoring Installation Data

Monitoring the site requires connecting the inverter to the monitoring platform, using
any of the wired or wireless options available from SolarEdge. Refer to Setting Up
Communication with the Monitoring Platform on page 53.
The Monitoring Platform
The monitoring platform provides enhanced PV performance monitoring and inverter
yield assurance through immediate fault detection and alerts at the module, string and
system level.
Using the platform, you can:
View the latest performance of specific components.
Find under-performing components, such as modules, by comparing their
performance to that of other components of the same type.
Pinpoint the location of alerted components using the physical layout.
The monitoring platform enables accessing site information, including up-to-date
information viewed in a physical or logical view:
Logical Layout: Shows a schematic tree-layout of the components in the system,
such as: inverters, Power Optimizers, strings, modules, meters and sensors, as well
as their electrical connectivity. This view enables you to see which modules are
connected in each string, which strings are connected to each inverter, and so on.
Physical Layout: Provides a bird's eye view of the actual placement of modules in
the site, and allows pinpoint issues to the exact location of each module on a
virtual site map.
If you do not report the mapping of the installed Power Optimizers, the monitoring
platform will show the logical layout indicating which Power Optimizers are connected
to which inverter, but will not show strings or the physical location of Power Optimizers.
The monitoring platform includes a built-in help system that guides you
through the monitoring functionality.
For more information, refer to
monitoring#/.
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
Chapter 5: Activating, Commissioning and Configuring the System
https://www.solaredge.com/products/pv-
    50

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se17kSe20kSe100kSe7kSe10kSe8k ... Show all

Table of Contents