SolarEdge Se K Series Installation Manual page 25

Three phase inverter with synergy technology
Hide thumbs Also See for Se K Series:
Table of Contents

Advertisement

ON (1) - Turning this switch ON (after Power Optimizer pairing) starts the operation
of the Power Optimizers, enables power production and allows the inverter to
begin exporting power to the utility grid.
OFF (0) - Turning this switch OFF reduces the Power Optimizer Voltage to a low
safety voltage and inhibits exportation of power. When this switch is OFF, the
control circuitry remains powered up.
P Position duration
Switch moved to P for
less than 5 seconds, then
released.
Switch moved to P for
more than 5 seconds,
then released.
WARNING!
For inverters with manual Rapid Shutdown (PVRSS) functionality - Upon
PVRSS, the internal circuitry remains up, therefore the inverter cover must
be opened only after shutting off the inverter ON/OFF switch. This disables
the DC Voltage inside the inverter (Synergy Manager). Wait five minutes
before opening the cover. Otherwise, there is a risk of electric shock from
energy stored in the capacitors.
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx
Chapter 3: Installing the Synergy Manager and Synergy Units
Function
Displays production information
for 5 seconds on the SetApp
screen.
Displays error type indications (if
exist) for 5 seconds.
Activates the Wi-Fi access point
for connecting to the SolarEdge
Inverter SetApp
Starts pairing
    24
Comments
While the switch
is in P, all LEDs
are ON

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Se17kSe20kSe100kSe7kSe10kSe8k ... Show all

Table of Contents