Chapter 4 : Maintenance; Service And Inspection Schedule - Aerotech ANT130R Hardware Manual

Hide thumbs Also See for ANT130R:
Table of Contents

Advertisement

ANT130R Hardware Manual

Chapter 4 : Maintenance

IM PORTAN T: If the bearing area is not kept free of foreign matter and moisture, the
performance and life expectancy of the stage will be reduced.
DAN GER: To minimize the possibility of bodily injury or death, disconnect all electrical
power prior to performing any maintenance or making adjustments to the equipment.

4.1. Service and Inspection Schedule

Inspect the ANT130R at least once per month. A longer or shorter inspection interval may be required
depending on the application and conditions, such as the duty cycle, speed, and environment.
In general, stages operating in a clean environment should be cleaned annually. For stages operating
under conditions involving excessive debris, stages should be cleaned every six months. In normal
operating conditions and with proper cleanliness of the stage, the bearing will not require lubrication or
maintenance for the life of the stage.
Monthly inspections should include but not be limited to:
Visually inspect the stage and cables.
l
Re-tighten loose connectors.
l
Replace or repair damaged cables.
l
Clean the ANT130R and any components and cables as needed.
l
Repair any damage before operating the ANT130R.
l
Inspect and perform an operational check on all safeguards and protective devices.
l
www.aer otech.com
Chapter 4
Maintenance
29

Advertisement

Table of Contents
loading

Table of Contents