Rigging procedures
Rigging procedures
Mounting on a U-bracket
type of deployment
rigging accessories
additional material
min number of operators
Additional safety for own arrays
When ying an enclosure or an array, use the M8 DIN580 threaded insert to implement a secondary safety.
Ceiling-mounting
Additional holes on the short U-bracket can be used for optimal visual impact.
In this case, the rigging procedure will require 2 operators.
Short U-bracket in horizontal position
In this position, the enclosure applies a diagonal force of 405 daN on the anchoring points.
Fasteners for wall-mounting or ceiling-mounting
Secure the bracket with three M10 screws.
Select screw length and anchors applicable to the wall or ceiling properties.
The procedure is shown with X-UL12 in horizontal position.
The same procedure applies for X-UL12 in vertical position or in ceiling-mounting conguration and X-US1215 in
horizontal or vertical position or in ceiling-mounting conguration.
Assembly
Procedure
1. Drive the knobs in the inserts on the enclosure.
Stop when the threading is halfway in.
46
wall-mounting
ceiling-mounting
X-US1215 or X-UL12
3 x M10 screws
electric screwdriver
1 or 2
X12 owner's manual (EN) version 1.0