Rigging Procedures; Mounting On A U-Bracket - L-Acoustics X12 Owner's Manual

Hide thumbs Also See for X12:
Table of Contents

Advertisement

Rigging procedures

Rigging procedures

Mounting on a U-bracket

type of deployment
rigging accessories
additional material
min number of operators
Additional safety for own arrays
When ying an enclosure or an array, use the M8 DIN580 threaded insert to implement a secondary safety.
Ceiling-mounting
Additional holes on the short U-bracket can be used for optimal visual impact.
In this case, the rigging procedure will require 2 operators.
Short U-bracket in horizontal position
In this position, the enclosure applies a diagonal force of 405 daN on the anchoring points.
Fasteners for wall-mounting or ceiling-mounting
Secure the bracket with three M10 screws.
Select screw length and anchors applicable to the wall or ceiling properties.
The procedure is shown with X-UL12 in horizontal position.
The same procedure applies for X-UL12 in vertical position or in ceiling-mounting conguration and X-US1215 in
horizontal or vertical position or in ceiling-mounting conguration.
Assembly
Procedure
1. Drive the knobs in the inserts on the enclosure.
Stop when the threading is halfway in.
46
wall-mounting
ceiling-mounting
X-US1215 or X-UL12
3 x M10 screws
electric screwdriver
1 or 2
X12 owner's manual (EN) version 1.0

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sb15mSb18Sb18 iiiKs21Ks21i

Table of Contents