STIEBEL ELTRON HSBC 300 cool Operation And Installation page 14

Integral cylinder
Table of Contents

Advertisement

INSTALLATIoN
Installation
HSBC 3-HKM installation
f Check the position of the 3-way mixer shaft. Adjust the posi-
f
tion if necessary.
(*)
11
8
6
(*) Pipe assembly inserted
6 Insulation mat for 3-way mixer
8 Servomotor for 3-way mixer
11 Profiles for 3-way mixer
48
| HSBC 300 cool | HSBC 300 L cool
f Insert the pipe assembly.
f Insert the flat gaskets into the union nuts for the connection
f Counterhold and secure the union nuts to the adaptors.
f Check the alignment of the pipes and functional elements of
f Install the profiles for the 3-way mixer over the mixing valve
f Place the insulation mat for the 3-way mixer on the valve
f Install the servomotor for the 3-way mixer
1-2 Nm
f Route the pump assembly connecting cable to the control
f Slide the pipe insulation over the connection pipe connectors
f
f
pipes.
f
f
the pump assembly. Retighten all fittings.
f
body and above the pump.
f
body.
f
Material losses
!
To prevent condensation from forming, do not lay any
cables in the joint grooves of the EPP parts.
f
panel as shown.
f
from above.
www.stiebel-eltron.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hsbc 300 l cool

Table of Contents