STIEBEL ELTRON HSBC 300 cool Operation And Installation page 11

Integral cylinder
Table of Contents

Advertisement

INSTALLATIoN
Preparation
Joining appliance sections
Material losses
To prevent condensation forming, the insulation seg-
ments must fit closely against the lower section with no
gaps.
f When inserting the insulation segments, ensure that
f
the joint grooves are kept clear
f Tap the insulation segments down with your hand.
f
Rejoin the appliance sections in reverse order.
The positioning aids and the dotted line marking provide assis-
tance when positioning and inserting the upper appliance section
into the guide groove on the lower section:
5
1 Handle
2 Guide pin
3 Dotted line (perforation in the panel)
4 Guide groove
5 Positioning aid
www.stiebel-eltron.com
1
1 Dotted line (perforation in the panel)
f Place the upper appliance section onto the lower appliance
f
section along the dotted line.
2
3
4
f Slide the upper appliance section to the back until it is flush
f
with the lower appliance section. If the appliance sections
are joined correctly, the final position is determined by the
guide groove and guide pin.
f Secure the tabs on the appliance front.
f
f Fit the side profile strips.
f
f Fit insulation segment 3 and the 4 hydraulic hoses.
f
f Connect the push-fit connectors of the 4 hydraulic connec-
f
tions. Ensure that the spring clips click into place.
f Insert the "heating sensor" into the buffer cylinder.
f
f Lay the sensor lead in the guide groove provided for this
f
purpose.
f Fit insulation segment 2.
f
f Fit insulation segment 1.
f
f Fit the front casing.
f
HSBC 300 cool | HSBC 300 L cool |
1
45

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hsbc 300 l cool

Table of Contents