Benchmark with Edge [I]: Operation-Maintenance Manual
SECTION 3 - START SEQUENCE
Benchmark 1500 Air/Fuel Valve Position and Energy Input
3.4.2
TABLE 3-3a: BMK1500 Air/Fuel Valve Position – NATURAL GAS
AIR/FUEL VALVE POSITION
(% OPEN)
16% (Stop Level)
20%
30%
40%
50%
60%
70%
80%
90%
100%
TABLE 3-3b: BMK1500 Air/Fuel Valve Position – PROPANE GAS
AIR/FUEL VALVE POSITION
(% OPEN)
18% (Stop Level)
20%
30%
40%
50%
60%
70%
80%
90%
100%
OMM-0145_D • GF-218 •
11/2/2020
ENERGY INPUT
(BTU/HR)
75,000 (22.3 kW)
127,000 (37.2 kW)
366,000 (107.2 kW)
629,000 (184.3 kW)
822,000 (240.9 kW)
977,000 (286.2 kW)
1,119,000 (327.9 kW)
1,255,000 (367.7 kW)
1,396,000 (409.0 kW)
1,502,000 (440.1 kW)
ENERGY INPUT
(BTU/HR)
75,000
93,700
254,000
505,000
680,000
807,000
947,000
1,157,000
1,379,000
1,503,000
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
BOILER ENERGY INPUT
(% OF FULL CAPACITY)
5.0%
8.5%
24.4%
41.9%
54.7%
65.0%
74.5%
83.5%
92.9%
100%
BOILER ENERGY INPUT
(% OF FULL CAPACITY)
5.0%
6.2%
16.9%
33.7%
45.3%
53.8%
63.1%
77.1%
91.9%
100%
Page 41 of 213