Quadra-Fire CB1200 Installation Manual page 22

Pellet insert
Hide thumbs Also See for CB1200:
Table of Contents

Advertisement

CB1200 Pellet Insert
4. Install the left shroud panel corner; 2 screws into
back of hopper and 1 screw down into the filler
piece (Figure 22.1).
1 screw down
into filler piece
Figure 22.1
5. Install the Rear Panel using six screws (Figure 22.2).
Figure 22.2
6. Install the cover plate over the top vent opening using 4
screws (Figure 22.3).
Figure 22.3
7. Attach the left shroud panel using eight
screws (Figure 22.4).
Figure 22.4
22
2 screws into
back of hopper
6 screws to attach
rear panel
8 screws to attach
left shroud panel
8. Assemble the right shroud panel corner and the right
shroud panel using 3 screws (Figure 22.5).
Figure 22.5
9. Attach the right panel assembly using 4 screws to
appliance (Figure 22.6).
Figure 22.6
10. Using the electric drill with #26 drill bit; drill 3 holes
into the hopper. Add three screws to secure shroud
assembly to the appliance (Figure 22.7).
Figure 22.7
11. Using the electric drill with #26 drill bit; drill 2 holes
into the back of the hopper. Add two screws to secure
shroud assembly to the appliance (Figure 22.8).
Figure 22.8
7027-804G
3 screws to attach right shroud
panel to right shroud corner piece
5 screws to attach
right shroud panel
Drill these 3
holes
Drill these 2
holes
05/21