Allied Telesis AR Series Hardware Reference Manual page 99

Hide thumbs Also See for AR Series:
Table of Contents

Advertisement

Hardware Reference
Figure 61: Location of PAC slot and pillar mounts on an AR740 base board.
RJ45
RJ45
Clr
Err
D
Act
Sec
Sys
Run
Pwr
PORT 0
PORT 1
STATUS LEDs
SLIDE-IN BAY 0
PIC BAY 0
MAC CARD SLOT
LITHIUM BATTERY
DO NOT
DISPOSE IN FIRE
RUN
POWER
SYSTEM
C613-03031-01 REV E
LNK/
LNK/
Swap
ACT
ACT
In
100
100
Use
ETHERNET 0
ETHERNET 1
SLIDE-IN BAY 1
PIC BAY 1
CLEAR
SECURITY
6.
Insert the PAC.
Position the PAC over the PAC slot on the router base card, making sure
that the support pillars located on the router base card are aligned with the
holes provided on the PAC. This ensures that the connector on the PAC is
correctly aligned with the slot on the router base card.
Press the connector firmly into place. Secure the PAC to its three pillars
using the fasteners supplied.
Figure 61 on page 99 shows the PAC slot on an AR740 base board.
7.
Replace the router's lid and the power cord.
Secure the router's lid. If you disconnected an RPS supply, reconnect it
now.
8.
If you disconnected interface cables to install the PAC, reconnect them.
The PAC is now ready to test.
Hot
Swap
Button
THREAD MOUNTS FOR PAC PILLARS
NSM BAY
NSM CONNECTOR
99
-12V
0V
0V
0V
+5V
+5V
+12V
-12V
0V
0V
+5V
+5V
+12V
740CPU

Advertisement

Table of Contents
loading

Table of Contents