Gree FP-8XD-E Service Manual page 52

Commercial air conditioners cassette type fan coil unit
Hide thumbs Also See for FP-8XD-E:
Table of Contents

Advertisement

② Fix the flap
Set the ribs on the sides of the air outlet to the slit of the flap
and then screw together to fix the flap.
① Check to make sure no objects obstructing the intake
and outlets parts on both the indoor and outdoor units.
② Check to make sure ground wire is connected and that
is not damaged.
③ Check to make sure air filter has been cleaned.
④ Turn on the power 6 hours before starting the air
conditioner.
① Clean the filter and the body of the unit.
② Turn off power.
③ Clear outdoor of dust.
If there is any rust in the outdoor unit, this should be
painted over to prevent the rust from spreading.
Unit MAINTENANCE
Before starting the air conditioner for the first time in the season.
End of season cleaning
50

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents