Start-Up Recommendations (CONTINUED)
14) When operating the meter with accessories, valves should be opened slowly to avoid a pressure
surge that can damage the meter or air eliminator. System pressures should be maintained below
70 PSI (4.9 BAR).
15) Custody transfer metering systems must be calibrated by a regulatory agency before product can
be sold off the meter. Contact your local authorities for proper calibration.
16) Strainers should be cleaned frequently as part of a regular maintenance schedule. Doing so
will ensure a clean system and long service life.

Direction of Flow

The meter is set up at the factory for left to right flow. To change the meter for right to left flow, begin
by removing the screws (#9 on the Meter Assembly Breakdown) and the adjuster cover plate (#7) on the
front of the meter. Remove the screws (#1), the drive shaft retainer (#10), the drive shaft (#3), the e-ring
(#4) and the face gear (#5). Reinstall the gear on the shaft with the gear teeth facing up. Snap the e-ring
back into place to hold the gear in place. Reinstall the shaft, mating the face gear with the drive gear of
the packing capsule assembly. Reinstall the screw and cover plate. The meter will now be set up for
right to left flow. See Page 22 for a parts breakdown of entire meter assembly.