Chapter 3 Getting Started Guide; Installation; Power Supply; Power Cord - Hantek DSO5000BM Series User Manual

Digital storage oscilloscope
Table of Contents

Advertisement

Getting Started Guide

Chapter 3 Getting Started Guide

3.1 Installation

To keep proper ventilation of the oscilloscope in operation, leave a space of more than 5cm away
from the top and the two sides of the product.

3.1.1Power Supply

Use a power supply that delivers 90 to 240 V
, 45 to 440 Hz.
RMS

3.1.2Power Cord

Use only power cords designed for this product. Refer to
8.2 Accessories
for specific standards.

3.2 Functional Check

Follow the steps below to perform a quick functional check to your oscilloscope.

3.2.1Power on the oscilloscope

Plug in the oscilloscope and press the ON/OFF button. Then push the DEFAULT SETUP button.
The default Probe option attenuation setting is 10X.
The Default Setup button
DSO5000 Series Digital Storage Oscilloscope User Manual
6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dso5062bmDso5102bmDso5202bm

Table of Contents