Wiring Diagrams; Indoor Units - Daikin FTKE25BVM Service Manual

Super multi nx c-series
Hide thumbs Also See for FTKE25BVM:
Table of Contents

Advertisement

Si12-411A

2. Wiring Diagrams

2.1

Indoor Units

2.1.1 Wall Mounted Type
FTKE25/35BVM, FTK(X)E25/35BVMA
FTK(X)S20CVMB(9), FTK(X)S25/35CVMB(9)(8), ATXS20/25/35CVMB(9), FTXS25/35BVMA
PCB3
S36
S35
INTELLIGENT-
EYE SENSOR
(
PCB2
S27
S26
LED1
LED2
LED3
S21
H1P
H2P
H3P
S1W
SIGNAL
RECEIVER
S32
R1T
R2T
WIRELESS
REMOTE
CONTROLLER
FTK(X)S50BVMB, FTXS50BVMA(8), ATXS50CVMB
PCB3
S27
S26
R1T
S38
PCB4
S37
S21
LED1
LED2
LED3
H1P
H2P
H3P
PCB5
S36
S35
INTELLIGENT EYE
SENSOR
PCB2
SIGNAL
RECEIVER
WIRELESS
S1W
REMOTE
CONTROLLER
Appendix
PCB1
)
TERMINAL FOR
CENTRALIZED CONTROL
S1
S7
M
S6
1
M
indoor
M1S
: PROTECTIVE EARTH
C70
: RUNNING CAPACITOR
FU
: FUSE
PCB1
~
~
RECTIFIER
TRANSMISSION
S28
S32
1
S6
5 1
S29
R2T
M
M1S
H1
Fu
3.15A
H2
C70
H3
TRANSMISSION
CIRCUIT
140°C
H1P~H3P
M1F
M1F
M1S
PCB1~PCB3
R1T~R2T
S1~S36
S1W
X1M
H1
Fu
3.15A
H2
H3
CIRCUIT
FG
S1
7
RED
BLU
BRN
M
ORG
1
WHT
M1F
S8
6
INDOOR
M
M2S

Wiring Diagrams

X1M
1
BLK
WHT
2
RED
3
GRN
/
FIELD WIRING.
YLW
CAUTION
NOTE THAT OPERATION WILL
RESTART AUTOMATICALLY IF
THE MAIN POWER SUPPLY IS
TURNED OFF AND THEN BACK
ON AGAIN.
: PILOT LAMP
: FAN MOTOR
: SWING MOTOR
: PRINTED CIRCUIT BOARD
: THERMISTOR
: CONNECTOR
: OPERATION SWITCH
: TERMINAL STRIP
FIELD WIRING.
X1M
BLK
1
WHT
2
RED
3
CAUTION
GRN
/
YLW
NOTE THAT OPERATION WILL
RESTART AUTOMATICALLY IF
THE MAIN POWER SUPPLY IS
TURNED OFF AND THEN BACK
ON AGAIN.
FG
: FRAME GROUND
Fu
: FUSE
: HARNESS
H1~H3
H1P~H3P
: PILOT LAMP
: FAN MOTOR
M1F
M1S , M2S
: SWING MOTOR
: PRINTED CIRCUIT BOARD
PCB1~PCB5
R1T , R2T
: THERMISTOR
: CONNECTOR
S1~S38
: OPERATION SWITCH
S1W
: TERMINAL STRIP
X1M
: PROTECTIVE EARTH
1
2
3
outdoor
3D033599E
1
2
3
OUTDOOR
3D038065G
273

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents